Search Header Logo

Q202 Masonry Applications (28105)

Authored by Gene Schramme

Other

9th - 12th Grade

Used 62+ times

Q202 Masonry Applications (28105)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mortar is easiest to clean from a masonry surface after it has dried.

true

false

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements about patching mortar is​ incorrect?

Pointing is done with soft mortar joints.

On deep​ joints, apply one thick joint when tuckpointing.

Tuckpointing replaces hardened mortar.

Wet the masonry before tuckpointing.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Control joints in a CMU wall should be no more than​ ____ apart.

15 feet

24 inches

30 feet

24 feet

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CMUs should be kept damp during storage to prevent shrinking and cracking.

true

false

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum compressive strength of​ non-structural block is​ ___ psi.

500

200

600

800

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a brick​ position?

flier

soldier

header

stretcher

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Bricks must have the proper moisture content so that​ ______.

the mortar will harden properly

the mortar can be mixed with less water

they​ won't split

they​ won't shrink

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?