Search Header Logo

Q202 Masonry Applications (28105)

Authored by Gene Schramme

Other

9th - 12th Grade

Used 62+ times

Q202 Masonry Applications (28105)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mortar is easiest to clean from a masonry surface after it has dried.

true

false

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements about patching mortar is​ incorrect?

Pointing is done with soft mortar joints.

On deep​ joints, apply one thick joint when tuckpointing.

Tuckpointing replaces hardened mortar.

Wet the masonry before tuckpointing.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Control joints in a CMU wall should be no more than​ ____ apart.

15 feet

24 inches

30 feet

24 feet

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CMUs should be kept damp during storage to prevent shrinking and cracking.

true

false

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum compressive strength of​ non-structural block is​ ___ psi.

500

200

600

800

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a brick​ position?

flier

soldier

header

stretcher

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Bricks must have the proper moisture content so that​ ______.

the mortar will harden properly

the mortar can be mixed with less water

they​ won't split

they​ won't shrink

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?