Site Organizational Studies

Site Organizational Studies

University

20 Qs

quiz-placeholder

Similar activities

Driver Ed midterm 2

Driver Ed midterm 2

10th Grade - University

18 Qs

VISITOR USE MANAGEMENT

VISITOR USE MANAGEMENT

University

15 Qs

Construction Equipment

Construction Equipment

University

20 Qs

FIN 340 Practice 1 #23, 24, 25, 26

FIN 340 Practice 1 #23, 24, 25, 26

University

19 Qs

Ict Quiz

Ict Quiz

KG - Professional Development

18 Qs

AWS hadoop

AWS hadoop

University

20 Qs

Past Tens (Engineering)

Past Tens (Engineering)

University

20 Qs

Module 2

Module 2

University

21 Qs

Site Organizational Studies

Site Organizational Studies

Assessment

Quiz

Other

University

Medium

Created by

CIVIL ASSIGNMENT

Used 19+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following would you consider when choosing a site

The price of the land

The closeness to various geographical features

The owner of the land

The type of soil on the site

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which of the following are not classified under the 4M of construction resources?

Manpower

Machines

Money

Managers

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The total number of people who can work to get something done is............

Labor

Foreman

Manpower

Machines

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The labor force comprise of people possessing a vast range of skills, from contractor to plumber, joiner to steel benders, each going to site to perform his specialist operation.

True

False

None of the above

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The optimum balance between the benefits expected of a project and the resources expended in its delivery is known as.

Money

Gains

Value for money

Profit

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

It is normally the first operation to be done when the alignment has been set out. What is it?

Reconnaissance

Survey

Field study

Site clearance

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

It consists of the removal and disposal of all bushes, trees, fences and loose boulders as well as the grass within the top soil

Erosion

Site clearance

Excavation

Bulldozing

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?