
Building Services - AC
Authored by Sateerah Hassan
Architecture
University
Used 40+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Package Unit Air Conditioning System is most suitable for ____________ buildings.
medium sized
large
small
highrise
2.
FILL IN THE BLANK QUESTION
30 sec • 1 pt
Name ONE of the two methods of removing indoor heat for a package unit system.
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
How is the conditioned air distributed into the rooms?
Through the pipes
Through the ducting system
Through the filters
Through the refrigerant
4.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
Which of the following are the main components in plant system? You can select more than once.
AHU
Water tank
Refrigerant plant
Cooling tower
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which of the following is FALSE about the air handling unit?
It will located at every floor of the building.
It received the treated air from the refrigeration plant.
It treats the air using the air-cooled method.
The damper inside the AHU helps to absorb the noise.
6.
FILL IN THE BLANK QUESTION
30 sec • 1 pt
How is the heat removed from the cooling tower?
7.
FILL IN THE BLANK QUESTION
30 sec • 1 pt
What is the most sophisticated and largest type of air conditioning system for buildings?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?