Search Header Logo

Building Services - AC

Authored by Sateerah Hassan

Architecture

University

Used 40+ times

Building Services - AC
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Package Unit Air Conditioning System is most suitable for ____________ buildings.

medium sized

large

small

highrise

2.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

Name ONE of the two methods of removing indoor heat for a package unit system.

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

How is the conditioned air distributed into the rooms?

Through the pipes

Through the ducting system

Through the filters

Through the refrigerant

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following are the main components in plant system? You can select more than once.

AHU

Water tank

Refrigerant plant

Cooling tower

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is FALSE about the air handling unit?

It will located at every floor of the building.

It received the treated air from the refrigeration plant.

It treats the air using the air-cooled method.

The damper inside the AHU helps to absorb the noise.

6.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

How is the heat removed from the cooling tower?

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

What is the most sophisticated and largest type of air conditioning system for buildings?

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?