Lean management

Lean management

University

12 Qs

quiz-placeholder

Similar activities

Solid and Hazardous waste

Solid and Hazardous waste

University

10 Qs

SIA W6

SIA W6

University

9 Qs

FOOD PURCHASING CONTROL

FOOD PURCHASING CONTROL

University

11 Qs

Katanya ini kuis PTI terakhir ya?

Katanya ini kuis PTI terakhir ya?

University

10 Qs

MSSC Manufacturing

MSSC Manufacturing

University

15 Qs

Pre-test JIT TOC

Pre-test JIT TOC

University

7 Qs

4S28_Session 10

4S28_Session 10

University

15 Qs

Recap Quiz

Recap Quiz

University

10 Qs

Lean management

Lean management

Assessment

Quiz

Science

University

Hard

Created by

Trâm Anh

Used 140+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a step in the lean manufacturing process?

Specify value

Document policies

Create flow

Aim for perfection

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lean manufacturing is a method of eliminating waste. What is the purpose of eliminating waste?

Reducing landfill shipments

Reduce lead time

Reduce production cost

Reduce both cost and lead time while increasing quality

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lean manufacturing reduces waste in three areas. What are those areas?

Process, planning, and people

People, process, and materials

People, planning, and materials

Process, materials, and waste

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of value-added activities?

Activity that increases the cost or value to the product

Activity that adds what the customer wants

Activity that adds processes to production

Activity that increases the purpose of the product

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Non-value-added activities are considered waste if they fall into one of the eight categories. Which waste includes poor workplace organization and layout issues?

Over-processing

Excess inventory

Excess motion

Transportation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Non-value-added activities are considered waste if they fall into one of the eight categories. Which waste ties up money in unsold product, material, and storage space?

Excess inventory

Waiting

Transportation

Over-processing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The stable operations within products allow the company to add this to its lean manufacturing core?

JIT

Jidoka

Standardization

Structure

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?