1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

After the finalization of SRS, we may like to estimate

Size

Cost

Development time

All of these

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which one is not a size measure for software

LOC

Function Count

Cyclomatic Complexity

Halstead’s program length

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Function count method was developed by

B.Beizer

B.Boehm

M.Halstead

Alan Albrecht

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Function point analysis (FPA) method decomposes the system into functional units. The total number of functional units are:

2

5

4

1

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Function point can be calculated by

UFP * CAF

UFP * FAC

UFP * Cost

UFP * Productivity

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

COCOMO was developed initially by

B.W.Bohem

Gregg Rothermal

B.Beizer

E. F. Codd

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A COCOMO model is

Common Cost estimation model

Constructive cost Estimation model

Complete cost estimation model

Comprehensive Cost estimation model

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?