OP/ODN Engg Course Exam

OP/ODN Engg Course Exam

Professional Development

24 Qs

quiz-placeholder

Similar activities

Progression revision 2

Progression revision 2

Professional Development

20 Qs

PSM Training

PSM Training

Professional Development

20 Qs

Cannock inspection and Testing 2

Cannock inspection and Testing 2

Professional Development

19 Qs

Project Resource Management I (20)

Project Resource Management I (20)

Professional Development

20 Qs

Mario Characters Game

Mario Characters Game

KG - Professional Development

19 Qs

memes

memes

KG - Professional Development

24 Qs

Fnaf

Fnaf

KG - Professional Development

26 Qs

CONTROL SYSTEMS

CONTROL SYSTEMS

Professional Development

20 Qs

OP/ODN Engg Course Exam

OP/ODN Engg Course Exam

Assessment

Quiz

Other

Professional Development

Medium

Created by

Carol Elep

Used 351+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the study and planning of pole setting and configuration, its accessories and supports for the construction of overhead line structures in the most economic and least hazardous measures.

Pole Line Design

Pole Setting

Pole Guying

Pole Construction

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This deals with the selection of poles and accessories for different setting based on types of soil and the circuit to be used.

Pole Line Design

Pole Setting

Pole Construction

Pole Guying

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the vertical measurement from guy ground line to the point where the guy is attached to the pole.

Lead

Pull

Height

Anchor

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A special type of overhead structure where there is an absence of tensile stress on messenger wire between two poles.

Slack Span Construction

Catenary Construction

Pull-off Construction

Cross-over Construction

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A kind of guying where the guy wire is installed at an angle with the direction of the pole line.

HEAD GUY

DOWN GUY

SIDEWALK GUY

SIDE GUY

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Deals with the counteracting and balancing of forces that affects the structural stability of poles on curves, corner, and dead ends.

HEAD GUYING

DOWN GUY

GUYING

LEAD

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the first PON splitter in an ODN.

LCP

NAP

OLT

ONU

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?