20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the collective term given to all work carried out above ground level?
Substructure
Superstructure
Above datum
Foundations
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What document is used on a plan or working set of drawings and provides detailed written information about the work being carried out?
COSHH Statement
Risk Assessment
Method Statement
Specification
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What would be placed between the two leaves of blockwork in the substructure before backfilling takes place?
Insulation
Mortar
Lean Mix Concrete
Nothing
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A strip foundation for a 300mm cavity wall is usually excavated to a width of:
400mm
500mm
600mm
900mm
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum distance a damp proof course should be positioned above ground level?
100mm
150mm
300mm
450mm
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The three classifications of damp proof course are:
Flexible, semi-flexible, rigid
Brick, slate, plastic
Flexible, semi-rigid, rigid
horizontal, vertical, diagonal
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a core hole, as shown in the image?
It allows air to ventilate the cavity
It provides access to the concrete floor slab
It allows for the cavity to be cleared of mortar droppings at the end of each day
It is where air bricks will eventually be positioned
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?