ECM566 Construction Project Management

ECM566 Construction Project Management

1st Grade

10 Qs

quiz-placeholder

Similar activities

F3 RBT BAB 2(2.1.1)

F3 RBT BAB 2(2.1.1)

1st - 9th Grade

12 Qs

SURAH AL GHASHIAH AYAT 1 - 13 (BAHAGIAN 1)

SURAH AL GHASHIAH AYAT 1 - 13 (BAHAGIAN 1)

1st Grade

15 Qs

DFS QUIZ

DFS QUIZ

1st Grade

10 Qs

四年级设计与工艺   单元五美食,我最爱!

四年级设计与工艺 单元五美食,我最爱!

1st - 4th Grade

10 Qs

量词(华语2)

量词(华语2)

1st - 10th Grade

10 Qs

KUIZ NACCOL

KUIZ NACCOL

1st Grade

15 Qs

CHAPTER 4 - MONITORING CONTRACT PERFORMANCE

CHAPTER 4 - MONITORING CONTRACT PERFORMANCE

1st - 4th Grade

10 Qs

TANGGUNGJAWAB SUAMI ISTERI

TANGGUNGJAWAB SUAMI ISTERI

1st - 10th Grade

10 Qs

ECM566 Construction Project Management

ECM566 Construction Project Management

Assessment

Quiz

Professional Development, Other, Life Skills

1st Grade

Medium

Created by

Mazlina Zaira Mohammad

Used 130+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Parties involved during the construction except

Supplier

Authorities

FInancial company

Jabatan Kerja Raya

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Role of contractor are ;


i) To built and complete the construction based on contract.

ii) To comply with the local authorities regulation.

iii) Own and finance the project.

iv) to bear all the carried out and completed work at the site.

i, ii and iii

i, ii and iv

i and iv

iii and iv

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Local authorities during construction are....


i) Tenaga Nasional Berhad

ii) Telekom Malaysia

iii) Jabatan Bomba & Penyelamat

iv) Indah Water Konsortium

ii, iii dan iv

i and iii

i and iv

i, ii, iii and iv

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Role of Jabatan Kerja Raya are..

i) Provide guidance on construction technology advice
ii) Provide technical advice to the government at the state, state and district levels.
iii) Examine and test the completed fire prevention system.
iv) Ensure clients comply with EIA orders. 

i dan ii

i and iii

i and iv

iii and iv

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Characteristic of construction management are ....


i) Complex and it involves a number of individuals from different departments.

ii) Unique and cannot be replicated.

iii) Consists of a number of associated activities

iv) Satisfy the owners requirement and expectations from the project.

i and ii

i and iii

ii, iii and iv

i, ii, iii and iv

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The major differences between  projects and operations are:
Projects are ongoing and operations are short
Projects should always be done by engineers and operations may be performed by technicians
Projects are temporary and operations are ongoing
Projects and operations are the same thing but projects always costs more to implement

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

How are project costs calculated?

By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources

By adding up the costs of all materials

By a calculation so complicated only a computer could do it

By multiplying the human resources by the material resources

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?