CS8083-Multi Core Architecture and Programming iat2

CS8083-Multi Core Architecture and Programming iat2

University

50 Qs

quiz-placeholder

Similar activities

UTS SISTEM DIGITAL PILIHAN GANDA

UTS SISTEM DIGITAL PILIHAN GANDA

University

50 Qs

A+1101 P2

A+1101 P2

University

50 Qs

Operating System Concepts Quiz

Operating System Concepts Quiz

University

45 Qs

FINAL-EXAM on Logical Algebra

FINAL-EXAM on Logical Algebra

University

50 Qs

Quiz Latihan Soal-Soal UTS Teori Bahasa dan Otomata 2021-2

Quiz Latihan Soal-Soal UTS Teori Bahasa dan Otomata 2021-2

University

50 Qs

1-45 key OSG

1-45 key OSG

University

45 Qs

Activity 3 - CC103

Activity 3 - CC103

University

50 Qs

PTIT Giữa kỳ - CSDL

PTIT Giữa kỳ - CSDL

University

50 Qs

CS8083-Multi Core Architecture and Programming iat2

CS8083-Multi Core Architecture and Programming iat2

Assessment

Quiz

Computers

University

Medium

Created by

ravi prabhu

Used 2+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The communication metrics for evaluate the performance of parallel programming is

a) Throughput

b) Response time

c) Both a) and b)

d) None of these

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The time to complete a single task is ________________Z

a) Response time

b) Reliability

c) None of these

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The ability of the system to complete tasks rather than on the duration of each individual task i

a) Throughput

b) Response time

c) Reliability

d) None of these

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

__________ will specify the expectations of the users of the system as well as penalties if the

system fails to meet these expectations.

a) Class of Service

b) Quality of Service (QOS)

c) Reliable metrics

d) None of these

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The amount of time that the system is unavailable, typically called _________

a) Reliability

b) Latency

c) Availabilty

d) Bandwidth

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following statement is/are true about critical metrics and their expectation early in

the design?

a) Clearly specified requirements

b) Knowing what metrics are expected.

c) Knowing what the inputs to the system

d) All the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

7. _______________ is the measure of how much computation a program will perform when

using a particular algorithm.

a) Algorithm complexity

b) Linear complexity

c) Cubic complexity

d) None of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?