CST 241, Ch 4: Grid and Trenches

CST 241, Ch 4: Grid and Trenches

University

9 Qs

quiz-placeholder

Similar activities

Area Review

Area Review

6th Grade - University

12 Qs

Area Review

Area Review

6th Grade - University

10 Qs

Measurements

Measurements

3rd Grade - University

10 Qs

Area Review

Area Review

6th Grade - University

10 Qs

Measurement Time

Measurement Time

4th Grade - University

13 Qs

Envision Topic 12 Measurement

Envision Topic 12 Measurement

4th Grade - University

13 Qs

Area of Perimeter

Area of Perimeter

8th Grade - University

14 Qs

Perimeter and Area

Perimeter and Area

6th Grade - University

10 Qs

CST 241, Ch 4: Grid and Trenches

CST 241, Ch 4: Grid and Trenches

Assessment

Quiz

Mathematics, Architecture

University

Medium

Created by

Chuck Wolfe

Used 3+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If your grid size is 40 ft x 20 ft, what is the area of each grid?

800 sq ft

80 sq ft

600 sq ft

60 sq ft

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If your Grid Area is 1600 sq ft, what is the Area constant?

A/4

400

44

4

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What modern ways does an estimator use to do a site takeoff? (choose all that apply)

Sonic digitizer

Sonic burger

Tablet digitizer

On Screen Takeoff

SWAG

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To get the trench volume, the following are used to calculate

centerline length, average footing width, cutback slope

centerline width, deepest excavation, footing width

centerline length, average width, average depth

centerline length, centerline width, cutback slope

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On grid method, the top 2 sections denote New Grade and Existing Grade, what is shown in the bottom 2 sections?

Depth of footing, width of footing

Area constant, volume cut

Depth of cut, depth of fill

Area constant, average depth

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The trench excavation calculated is 300 cu. yds and the backfill amount is 180 cu. yds. How much dirt do you need to have delivered?

120 cu. yds

480 cu. yds

0

100 cu. yds

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If your new elevation is 5.4 ft and existing elevation is 9.4 ft. What change needs to be recorded on the grid?

4 ft cut

4 ft fill

4.4 ft cut

0

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Piles can be timber, steel or precast concrete

True

False

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a vertical or near-vertical excavation needs to be done, it does not require to be supported by piles, soil nails or some other engineered method.

True

False