1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the objective of the economic dispatch problem?
The objective of economic dispatch problem is to maintain the operating cost of active power generation.
The objective of economic dispatch problem is to maximize the operating cost of active power generation.
The objective of economic dispatch problem is to reduce the operating cost of active power generation.
The objective of economic dispatch problem is to minimize the operating cost of active power generation.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Economic distribution of loads between plants also know as _____________.
unit commitment
economic dispatch
coordination equation
Lagrange’s method
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The rate of change of fuel cost with active power generation is called______________________.
incremental fuel-cost
participation rate
incremental rate
base point
4.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
Choose the statement or statements that describes the following case: "For economic dispatch that neglecting on both line losses and generation limits,"
it is the most complicated economic dispatch problem.
total generation is equal to the total demand.
all the generator will share the load equally.
when losses are neglected with no generator limits, for optimal dispatch all plants must operate at equal incremental fuel-cost.
None of the above
5.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
For economic dispatch that neglecting line losses but including generation limits, what should be done if the power is outside the limit of a generator?
The generator shall stop supplying immediately.
The generator will remain as the participating generator in the optimization of dispatched power.
The generator should be set to the limit, either at the minimum or maximum power
The generator should always running at its rated power.
The generator is no longer a participating generator in the optimization of dispatched power
6.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
What are the techniques for the solution of the unit commitment problem?
Priority List Method
Dynamic Programming Method
Lagrange Relaxation Method
Kuhn-Tucker Method
ALL of the above
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Define minimum up time.
Once the unit is decommitted, there is a minimum time before it can be recommitted.
Once the unit is decommitted, there is a maximum time before it can be recommitted.
Once the unit is running, it should be turned off immediately.
Once the unit is running, it should not be turned off immediately.
Create a free account and access millions of resources
Similar Resources on Wayground
46 questions
Fundamentals of Accountancy, Business and Management Exam

Quiz
•
University
53 questions
Bridge Structure Vocabulary

Quiz
•
9th Grade - University
50 questions
Motors Final Review 0 RF

Quiz
•
University
54 questions
Cuestionario Semana 2

Quiz
•
KG - Professional Dev...
48 questions
Final SOL Review 2016

Quiz
•
8th Grade - University
45 questions
EE8501 POWER SYSTEM ANALYSIS MODEL EXAM NOV 2020

Quiz
•
University
50 questions
Seamanship reviewer

Quiz
•
University
51 questions
Multimedia 2 Quiz 2

Quiz
•
University
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade