AUTO 1 QUIZ FINAL

AUTO 1 QUIZ FINAL

University

30 Qs

quiz-placeholder

Similar activities

Google

Google

3rd Grade - University

25 Qs

CASA B1-1 Module 15B Gas Turbine Engines

CASA B1-1 Module 15B Gas Turbine Engines

12th Grade - Professional Development

28 Qs

Vehicle Maintenance Quiz

Vehicle Maintenance Quiz

5th Grade - University

30 Qs

Space Travel

Space Travel

12th Grade - University

25 Qs

Regular Verbs Pronunciation

Regular Verbs Pronunciation

University

25 Qs

Pronunciation of the endings of base verbs or past simple verbs.

Pronunciation of the endings of base verbs or past simple verbs.

University

25 Qs

Engine

Engine

7th Grade - University

25 Qs

EN Motorcycle Parts and Functions Quiz

EN Motorcycle Parts and Functions Quiz

12th Grade - University

25 Qs

AUTO 1 QUIZ FINAL

AUTO 1 QUIZ FINAL

Assessment

Quiz

English, Physics

University

Hard

Created by

Tesla’s Hub

Used 5+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. In the P&ID (Figure 1) shown, where is TIC123 (A) located?

at the equipment

inside the control room

behind the panel

on the instrument rack

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. In P&ID using ISA Symbology, what does FIC mean?

Flow Indicating Controller

Flow Instrument Controller

Fast Integral Controller

Feedback Integral Control

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In the P&ID (Figure 1) shown, what type of line connects TIC 123 (A) and FIC 123

data links

pneumatic signal

process piping

electric signal

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In the P&ID (Figure 1) shown, what type of line connects where is FIC123 located

at the equipment

inside the control room

behind the panel

on the instrument rack

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. In P&ID using ISA Symbology, what does TT mean?

Temperature Transmitter

Totalizer Transmitter

Thermometer Tag

Temperature Tag

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. In the P&ID (Figure 1) shown, what type of line connects TIC 123 (B) and the pneumatic valve?

data links

pneumatic signal

process piping

electric signal

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Referring to Figure 6 (Central Cooling System P&ID), what does LAH in the expansion tank mean?

High level alarm

Level and humidity alarm

low level alarm

level alarm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?