Search Header Logo

Ag Mech 1 - Planning Construction

Authored by Jessica Duncan

Other

10th - 12th Grade

Used 15+ times

Ag Mech 1 - Planning Construction
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a project is made using both wood and metal, the wood should be fastened to the metal by using:

bolts

glue

nails

welding

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Time is a major factor to consider in planning agricultural construction or repairs because:

everyone wants to be first.

hunting season opens on October 15.

agricultural work is seasonal.

the tax year ends on April 15.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The number of square feet of materials needed to cover four 10-foot high walls of a building 30 feet wide and 70 feet long is:

400

2000

3800

8400

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most important thing to consider when planning construction of a building is:

the brand of tools.

the cost of building.

lumber supplies.

paint color.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The grade of exterior plywood with the best face and the worst back is:

AA.

AB.

AC.

CC.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How many sheets of 4' × 8' flooring grade plywood are needed to cover the floor of a storage building that is 16' long and 20' wide?

5

10

15

20

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of siding has a rabbet cut on each edge?

common

off center

shiplap

tongue and groove

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?