Quiz on Unit 3

Quiz on Unit 3

University

85 Qs

quiz-placeholder

Similar activities

Cumulative Nutrition Exam

Cumulative Nutrition Exam

University - Professional Development

81 Qs

AGBUS 1100 - FINAL EXAM

AGBUS 1100 - FINAL EXAM

University

90 Qs

EL_6_PE-2(2160902)_2020

EL_6_PE-2(2160902)_2020

University

80 Qs

PRETREATMENT PHASE

PRETREATMENT PHASE

University

81 Qs

PAES 600 QUIZ 1

PAES 600 QUIZ 1

University

83 Qs

AEM Business Practitioner Quiz

AEM Business Practitioner Quiz

University

81 Qs

Connaissance biblique

Connaissance biblique

6th Grade - University

85 Qs

Signals & Systems Phase 1

Signals & Systems Phase 1

University

80 Qs

Quiz on Unit 3

Quiz on Unit 3

Assessment

Quiz

Other

University

Medium

Created by

Director, HRDC JNTUH

Used 3+ times

FREE Resource

85 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

1. Which of the following earth dam is suitable only on impervious foundation?

Zoned embankment type

Homogenous embankment type

Non-homogenous type

Diaphragm type

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2. Which of the following zone in Zoned type embankment prevents piping through cracks?

Central core

Transition zone

Outer zone

Core wall

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

3. Which embankment has the thickness of the diaphragm at an elevation less than 10 meters or the height of the embankment above the corresponding elevation?

Diaphragm type dam

Zoned type dam

Non-homogenous earth dam

Homogenous earth dam

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

4. The blanket in earth dam is provided ___________________

at the ground level on u/s side

at the ground level on the d/s side

at the ground level of the D/s side of the dam

on the D/s slope

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

5. Which of the following statement is correct with reference to earthen dams?

These dams are very costly as compared to other types

Gravity dams are less susceptible to failure as compared to rigid dams

These dams are suitable for construction on almost every type of foundation

Highly skilled labor is generally not required

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

6. During the construction of an earthen dam by hydraulic fill method, development of pore pressure becomes important in the ________

central impervious core

pervious outer shell

transition zone

both central core and outer shell

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

7. The process of laying and compacting earth in layers by power rollers under OMC for construction of earthen dams is known as ______________________

Rolled fill method

Hydraulic fill method

OMC method

Compaction

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?