Line Balancing

Line Balancing

1st - 5th Grade

5 Qs

quiz-placeholder

Similar activities

Dr. King is My Grandpa/These Kids are Changing the World

Dr. King is My Grandpa/These Kids are Changing the World

5th Grade

10 Qs

Posttest Kelas Pajak Transfer Pricing Sesi 2

Posttest Kelas Pajak Transfer Pricing Sesi 2

1st - 3rd Grade

8 Qs

How to hold an assembly

How to hold an assembly

5th Grade

10 Qs

Mode of Learning

Mode of Learning

1st - 6th Grade

10 Qs

Romanian culture

Romanian culture

1st - 5th Grade

8 Qs

Understanding Layout Decision

Understanding Layout Decision

1st Grade

6 Qs

UAE SST Grade-3

UAE SST Grade-3

3rd Grade

10 Qs

Blue-X Virtual Learner Experts

Blue-X Virtual Learner Experts

4th - 12th Grade

10 Qs

Line Balancing

Line Balancing

Assessment

Quiz

Education

1st - 5th Grade

Hard

Created by

lina gozali

Used 7+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mana dari pernyataan ini yang salah tentang assembly line?

Assembly lines tend to be paced by work tasks assigned to individuals or workstations

Assembly lines therefore can be balanced by moving task form one individual or workstation to another. In this manner, the amount of time required by each individual or workstation is equalized

Assembly line is a production line in which material moves continuously at a uniform maximum rate through a sequence of workstations where assembly work is performed

Manual assembly line is a production line that consists of sequence of workstations where assembly are performed by human worker.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Work station

A workstation on manual assembly line is designated location along the work flow path at which one or more work elements are performed by one or more workers.

A workstation on automatic assembly line is designated location along the work flow path at which one or more work elements are performed by one or more workers.

A workstation on manual assembly line is designated location along the work flow path at which one or more work station are performed by one or more workers.

semua salah

semua benar

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mana yang bukan metoda Line Balancing

Largest Candidate Rule

Kilbridge and Webster Method

Ranked Positional Weights Method

Moodie Young

Silver Meal

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Kriteria yang tidak dipakai sebagai metoda Keseimbangan Lini yang terbaik.

Efisiensi lini

Balance Delay

Smoothing Index

waktu SIklus terpendek

Helgeson-Birnie

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tindakan apa yang diambil jika ada pembebanan mesin yang tidak seimbang

lembur untuk mesin yang pembebanan tinggi

penambahan mesin yang pembebanan tinggi

Tambah shift untuk mesin yang pembebanan tinggi

semua benar

semua salah