
Electrical principles and processes 1
Authored by John Flower
Professional Development
2nd Grade
Used 181+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
22 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When carrying out a continuity test would you expect:
A very high reading
No reading at all
A variable reading
A very low reading
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A fault in an electric circuit can be caused by:
Low load
Heavy load
Over load
Limited load.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Test probes on a multimeter must have a maximum exposed tip of:
1mm
2mm
3mm
4mm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When working on a system that has had a section of pipework removed, which of the following should be used?
Permanent polarity bonding
Permanent earth continuity bonding
Temporary polarity bonding
Temporary earth continuity bonding.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A radiator fitted near to a shower in a bathroom could require:
Supplementary bonding
Main bonding
Minor bonding
Additional bonding.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is an MCB fitted?
Consumer unit
Outside socket
Extension lead
Electric shower
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The design, installation and testing of electrical systems is covered by:
BS6700
BS1212
BS7671
BS7176.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?