PHA Process Hazard Analysis

PHA Process Hazard Analysis

Professional Development

10 Qs

quiz-placeholder

Similar activities

Pertamina JBB Fun Quiz

Pertamina JBB Fun Quiz

Professional Development

10 Qs

Reinforcement and Punishment

Reinforcement and Punishment

7th Grade - Professional Development

7 Qs

Swiss Cheese Quiz

Swiss Cheese Quiz

Professional Development

10 Qs

Kuis Sosialisasi Standar Mobil Tangki BBM & SKidtank LPG

Kuis Sosialisasi Standar Mobil Tangki BBM & SKidtank LPG

Professional Development

10 Qs

Sector 2 is Love, Sector 2 is Life

Sector 2 is Love, Sector 2 is Life

Professional Development

10 Qs

What If It Finishes

What If It Finishes

5th Grade - Professional Development

9 Qs

MA0568 Basic Tanker Training - Topic 2

MA0568 Basic Tanker Training - Topic 2

Professional Development

10 Qs

Behavior Based Safety

Behavior Based Safety

Professional Development

10 Qs

PHA Process Hazard Analysis

PHA Process Hazard Analysis

Assessment

Quiz

Other

Professional Development

Medium

Created by

Murad Jafarov

Used 12+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A vessel containing refrigerated LPG develops a leak; the leaking LPG finds a source of ignition and ignites, creating a fire, the causes damage to some equipment.

The LPG in storage

The leak of LPG

The resulting fire

The damage

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the below is a Physical hazard?

Methane gas

Stabilized crude oil

Electricity

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the followings is not a GOAL of Hazard Identification study?

Completeness

Structure

Auditability

Automation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is not a PHA Method?

HAZOP

Design Review

FTA

What-if

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Risks are generally represented on Risk ...

Matrices

Tables

Spreadsheets

Checklists

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is NOT a step in Scenario Development?

Consequence Analysis

Likelihood Analysis

Automation of the system

All are steps of Scenario Development

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two axes of the Risk Matrix?

Severity and Likelihood

Cause and Consequence

Likelihood and Cause

None of the Above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?