ISTQB_Chapter3

ISTQB_Chapter3

1st Grade

94 Qs

quiz-placeholder

Similar activities

EOC REPASO

EOC REPASO

KG - University

90 Qs

Bilan F3 - Vocabulaire

Bilan F3 - Vocabulaire

1st - 5th Grade

90 Qs

Le pluriel

Le pluriel

1st Grade

98 Qs

Passé simple (10CO)

Passé simple (10CO)

1st - 5th Grade

89 Qs

Bài làm lớp 1

Bài làm lớp 1

1st Grade

96 Qs

Bases Francais 1

Bases Francais 1

1st - 10th Grade

89 Qs

J2 (final A) practice

J2 (final A) practice

KG - University

89 Qs

Valencià Primer - Unitat 14

Valencià Primer - Unitat 14

1st Grade

98 Qs

ISTQB_Chapter3

ISTQB_Chapter3

Assessment

Quiz

World Languages

1st Grade

Medium

Created by

Oanh Duong

Used 14+ times

FREE Resource

94 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q.1: What can static analysis NOT find?

A. The use of a variable before it has been defined.

B. Unreachable (“dead”) code.

C. Memory leaks

D. Array bound violations.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q.2: Which of the following statements regarding static testing is false:

A. Static testing requires the running of tests through the code

B. Static testing includes desk checking.

C. Static testing includes techniques such as reviews and inspections

D. Static testing can give measurements such as cyclomatic complexity

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q.3: Who are the persons involved in a Formal Review:

i. Manager

ii. Moderator/ người điều hành

iii. Scribe / Recorder

iv. Assistant Manager

A. i,ii,iii,iv are true

B. i,ii,iii are true and iv is false.

C. ii,iii,iv are true and i is false.

D. i,iv are true and ii, iii are false.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q.4: A Person who documents all the issues, problems and open points that were identified during a formal review.

A. Moderator.

B. Scribe

C. Author

D. Manager

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q. 5: Which typical defects are easier to find using static instead of dynamic testing?

L. Deviation from standards

M. Requirements defects

N. Insufficient maintainability

O. Incorrect interface specifications

A. L, M, N and O

B. L and N

C. L, N and O

D. L, M and N

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q. 6: Which of the following statements is true of static analysis:

A. Compiling code is not a form of static analysis.

B. Static analysis need not be performed before imperative code is executed.

C. Static analysis can find faults that are hard to find with dynamic testing.

D. Extensive static analysis will not be needed if white- Box testing is to be performed.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Q.7: The KickOff phase of a formal review includes the following:

A. Explaining the objective

B. Fixing defects found typically done by author

C. Follow up

D. Individual Meeting preparations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?