CYK8 Connectivity Issues

CYK8 Connectivity Issues

Professional Development

16 Qs

quiz-placeholder

Similar activities

Sharing Knowledge Hughes Network System

Sharing Knowledge Hughes Network System

University - Professional Development

20 Qs

WSMS Internet Basics: Wireless Networking Review

WSMS Internet Basics: Wireless Networking Review

6th Grade - Professional Development

20 Qs

ITF - Quiz 6.4 - Networking Interfaces

ITF - Quiz 6.4 - Networking Interfaces

Professional Development

15 Qs

CYK6 Siebel & WFT

CYK6 Siebel & WFT

Professional Development

15 Qs

Network Basics Part 1

Network Basics Part 1

Professional Development

18 Qs

Technical Support Quiz NZ

Technical Support Quiz NZ

Professional Development

15 Qs

CYK10-AT&T Products and Services

CYK10-AT&T Products and Services

Professional Development

14 Qs

Software Testing Methodologies and Standards

Software Testing Methodologies and Standards

Professional Development

15 Qs

CYK8 Connectivity Issues

CYK8 Connectivity Issues

Assessment

Quiz

Computers

Professional Development

Hard

Created by

Training ATT

Used 148+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Per the myCSP article *311892 WFT BBT Enhancement Training the customer's modem may be in sync or out of sync; you must determine the state of the modem by discussing with the customer.

Good Line

Line Out of Sync

Line Errors

Marginal Bit Rate

Bad Bit Rate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Per the myCSP article _______ is a measurement of the total number of bits that can be transmitted per unit of time from the DSLAM to the customer's modem.

Bit rate.

Noise Margin.

Line Errors.

Sync Status.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

WFT identifies when a customer’s line is pre-qualified for AT&T Internet.

Green

Blue

Red

Yellow

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inability to access some databases, tools or sections of My CSP. Outages of this sort, while a hindrance, are not as severe as a complete outage.

Partial outage

Limited outage

Complete outage

One application outage

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

DSL service disconnected in error (DIE) triggering events include: (check all that apply)

Unwarranted Disconnected.

No sync.

Suspended service.

Late payment.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Break Points Methodology shows you____________.

The big picture.

Unwarranted disconnects.

Partial outages.

Line errors.

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When a customer calls in with a connectivity issue you will: (check all that apply)

Use probing questions to help determine the type of problem.

Start with an open-ended questions.

Follow-up with closed ended questions.

Share a similar story.

Commit to resolving the issue.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?