unit-2-requirement engineering

unit-2-requirement engineering

University

30 Qs

quiz-placeholder

Similar activities

HCI 323 - FINAL EXAM

HCI 323 - FINAL EXAM

University

33 Qs

PDM Workshop Test

PDM Workshop Test

University - Professional Development

25 Qs

Software Engineering-Module I

Software Engineering-Module I

University

35 Qs

SoEn

SoEn

University

25 Qs

Software Engineering - Test 2 Sample

Software Engineering - Test 2 Sample

University

35 Qs

System Development Life Cycle - 12CompSci

System Development Life Cycle - 12CompSci

10th Grade - University

25 Qs

SE for AI Technical Quiz

SE for AI Technical Quiz

University

25 Qs

Software Engineering

Software Engineering

University

30 Qs

unit-2-requirement engineering

unit-2-requirement engineering

Assessment

Quiz

Computers

University

Medium

Created by

SATHYA CSE

Used 16+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The process to gather the software requirements from client, analyze and document them is known as

Feasibility Study

Requirement Gathering

Requirement Engineering

System Requirements Specification

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The goal of requirement engineering is to develop and maintain sophisticated and descriptive _________________ document.

Feasibility Study

Requirement Gathering

Software Requirement Validation

System Requirements Specification

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following is not included in the Software Requirements Specification(SRS) Document ?

Functional Requirements

Non-functional requirement

Goals of implementation

User manual

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following expects cost estimation from SRS document ?

Project Manager

User documentation writer

Software developers

Maintenance engineers

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The goal of reading SRS document by the software developer is to

ensure requirements are understandable from a functionality point of view

understand the features of the product

ensure that the software is developed as per customer needs

Analyzing the cost of development

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Risk analysis of a project is done in

System Analysis phase

Feasibility Study

Implementation phase

Maintenance phase

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which one is a functional requirement?

Security

Data Integrity

Throughput

None of the options are correct

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?