1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the correct statement represents job costing

Only includes Prime Cost

To provide selling price of the product

To calculate Cost unit based single job order

To identify the cost of productions

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the best description of job costing?

used when a product of one process becomes the material of another
used in areas such as hotels, transport and entertainment where an actual product is not made
used to determine a break-even point
used when work consists of different products each time, made to meet customer's specific needs

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What items of expenditure go together to make up the PRIME COST?

Materials only
Labour only
Both materials and labour
Materials, labour and overheads

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The two basic types of cost accounting systems are:

Job order costing and perpetual costing.
Job order costing and customized product costing.
Job order costing and periodic costing.
Job order costing and process costing.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Conversion costs are

direct material plus labour cost

direct labour plus manufacturing overhead

direct materials plus manufacturing overhead

indirect material plus indirect labour

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Process costing is a method of costing used in what type of industries?

Manufacturing
Construction
Transportation
Hospitality

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manufacturing overhead is underapplied if :

actual overhead is less than applied overhead

actual overhead is greater than applied overhead

the predetermined overhead rate equals the actual rate

actual overhead equals applied overhead

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?