2391-50 Inspection and Testing

2391-50 Inspection and Testing

1st - 12th Grade

40 Qs

quiz-placeholder

Similar activities

Alternating Current

Alternating Current

12th Grade

36 Qs

2391-51

2391-51

1st - 12th Grade

40 Qs

Electrical Engineering Quiz

Electrical Engineering Quiz

12th Grade

45 Qs

Fault Diagnosis & Rectification - Quiz 3

Fault Diagnosis & Rectification - Quiz 3

12th Grade

45 Qs

Electrical installations level 2 Technology

Electrical installations level 2 Technology

11th Grade

36 Qs

chapitre 12

chapitre 12

KG - 7th Grade

39 Qs

Unit 5: Judicial Branch Review

Unit 5: Judicial Branch Review

8th - 12th Grade

44 Qs

Robotics 11 - Bridging Examination

Robotics 11 - Bridging Examination

11th Grade

40 Qs

2391-50 Inspection and Testing

2391-50 Inspection and Testing

Assessment

Quiz

Other

1st - 12th Grade

Hard

Created by

Chris Falet

Used 40+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1 What is the main purpose of an Initial Verification?

A. To complete the testing and issue an Electrical Installation Certificate.

B. To make a judgement that the installation is safe for continued use.

C. To confirm an installation is safe to be put into service.

D. To ensure all testing has been carried out.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

2 What situation requires the issuing of a Minor Electrical Installation Works Certificate?

A. An additional lighting circuit has been installed.

B. Changing a consumer unit and protective devices.

C. Upgrading the cable and circuit breaker for a shower circuit.

D. Additional socket-outlets added to an existing ring final circuit.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

3 Which statutory document contains specific information relevant to Initial Verification?

A. The Electricity at Work Regulations.

B. Health and Safety guidance GS38.

C. The Health and Safety at Work Act.

D. BS 7671, Requirements for Electrical Installations.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

4 What is the minimum voltage which requires the test leads and probes to comply with GS38?

A. 25 V AC.

B. 50 V AC.

C. 120 V AC.

D. 150 V AC.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

5 How many voltage measurements are required to confirm that a three-phase four-wire installation is safely isolated?

A. 3

B. 6

C. 9

D. 10

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

6 What precaution is required before carrying out a test of external earth fault loop impedance (Ze) so as to avoid danger to users of an installation?

A. Lock off the supply.

B. Use insulated screwdrivers.

C. Warn the occupier of the premises.

D. Disconnect the main protective bonding conductors.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

7 Why does BS 7671 require inspection to be carried out before testing?

A. To confirm the installers have installed as per the job specification.

B. To confirm all the equipment is connected to the installation will work.

C. To confirm the installation is complete and it is safe to commence testing.

D. To confirm the Earthing Conductor is connected and it is safe to commence testing.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?