Scope Management

Scope Management

University - Professional Development

10 Qs

quiz-placeholder

Similar activities

Fundamentals of IS (Project Management & Strategic Planning)

Fundamentals of IS (Project Management & Strategic Planning)

University

15 Qs

Project Life Cycle

Project Life Cycle

Professional Development

10 Qs

Quiz on Decomposition Techniques in Software Engineering

Quiz on Decomposition Techniques in Software Engineering

University

15 Qs

Quiz

Quiz

University

9 Qs

First Quiz - CS326A

First Quiz - CS326A

University

15 Qs

Jira

Jira

University

15 Qs

Test Management

Test Management

Professional Development

10 Qs

แบบทดสอบย่อย เรื่อง การตัดต่อด้วย Premiere Pro

แบบทดสอบย่อย เรื่อง การตัดต่อด้วย Premiere Pro

University

10 Qs

Scope Management

Scope Management

Assessment

Quiz

Computers

University - Professional Development

Medium

Created by

Wafaa Shalash

Used 79+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

a task at the lowest level of the WBS

work breakdown structure (WBS)

work bakage

WBS dictionary

Joint Application Design (JAD)

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project

work breakdown structure (WBS)

work bakage

WBS dictionary

Joint Application Design (JAD)

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

a document that describes detailed information about each WBS item

work breakdown structure (WBS)

work bakage

WBS dictionary

Joint Application Design (JAD)

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

the difference between planned and actual performance

work breakdown structure (WBS)

work bakage

requirement

Variance

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

a plan that describes how project requirements will be analyzed, documented, and managed

project scope management

requirements management plan

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

a condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document

WBS

work bakage

requirement

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

creating a WBS by using a similar project's WBS as a starting point

bottom-up approach

analogy approach

mind-map approch

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?