Inspection and Testing Mock

Inspection and Testing Mock

1st - 12th Grade

35 Qs

quiz-placeholder

Similar activities

N.A - IMTAQ PTS GANJIL 7 2024

N.A - IMTAQ PTS GANJIL 7 2024

7th Grade

30 Qs

SEJARAH T4/B3

SEJARAH T4/B3

5th - 10th Grade

33 Qs

INFORMATIKA X B, ANGGI WIDYASARI,S.Kom (STS GANIL)

INFORMATIKA X B, ANGGI WIDYASARI,S.Kom (STS GANIL)

1st Grade

30 Qs

Ulangan Harian Kerjasama Internasional

Ulangan Harian Kerjasama Internasional

11th Grade

30 Qs

Repaso

Repaso

12th Grade

36 Qs

PENGANTAR EKONOMI

PENGANTAR EKONOMI

1st Grade - University

40 Qs

PAS IPA Klas 8 FGH

PAS IPA Klas 8 FGH

7th Grade

40 Qs

Praktikum akuntansi dagang dan manufaktur kelas XII AKL

Praktikum akuntansi dagang dan manufaktur kelas XII AKL

12th Grade

30 Qs

Inspection and Testing Mock

Inspection and Testing Mock

Assessment

Quiz

Other

1st - 12th Grade

Practice Problem

Medium

Created by

Chris Falet

Used 113+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1 Who, under the Electricity at Work Regulations, should the inspector ensure the safety of?

A. Themselves.

B. The client and others.

C. Both themselves and others.

D. Staff in other buildings owned by the client.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Where is the correct location to test that a lighting circuit is isolated and safe to work on?

A. At the supply intake position.

B. On the supply side of the circuit protective device.

C. At any convenient luminaire.

D. On the load side of the circuit protective device.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How many keys must be available for a lock that is used to securely isolate a protective device?

A. 1.

B. 2.

C. 3.

D. 4.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Why is safe isolation carried out?

A. To allow earth fault loop impedance testing.

B. To allow phase sequencing testing.

C. To stop RCDs operating when testing.

D. To stop contact with live parts.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Testing is to be carried out at the origin of a large, unoccupied building which has a standby generator. What must be done before tests are carried out?

A. Check the operation of the standby supply.

B. All main protective bonding must be disconnected.

C. Temporary lighting must be installed for all escape routes.

D. The standby supplies must be isolated to ensure safe testing.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The implications of not carrying out a safe isolation could lead to prosecution. Which statutory legislation would be used for this purpose?

A. COSHH.

B. ESCQR.

C. EAWR.

D. BS 7671.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which document is statutory?

A. BS 7671.

B. EAWR.

C. GN3.

D. GS38

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?