lean manufacturing

lean manufacturing

Professional Development

13 Qs

quiz-placeholder

Similar activities

Anime 99

Anime 99

9th Grade - Professional Development

13 Qs

Redmi Note 10 Series

Redmi Note 10 Series

Professional Development

12 Qs

PTS & PSM Integrity Amazing Race Quiz

PTS & PSM Integrity Amazing Race Quiz

Professional Development

10 Qs

Complete Recovery  EQ DAY 2

Complete Recovery EQ DAY 2

Professional Development

10 Qs

Design Thinking - Quiz

Design Thinking - Quiz

Professional Development

15 Qs

INTELLIGENCE

INTELLIGENCE

Professional Development

10 Qs

Week 16 - Primary Survey Recap

Week 16 - Primary Survey Recap

University - Professional Development

12 Qs

Noom | Day 3 - Enrollment

Noom | Day 3 - Enrollment

Professional Development

16 Qs

lean manufacturing

lean manufacturing

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

PRASANTH NTTF

Used 39+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A methodology that focuses on minimizing waste within manufacturing systems while simultaneously maximizing productivity is called

Lean manufacturing

Quality Assurance

Planning

None of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lean manufacturing practices are initiated by

Ford

Toyota

Benz

Maruthi

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

TPS is

Toyota Planning System

Toyota Production System

Toyota Power System

Toyota Public System

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The principles underlying the TPS are embodied in The Toyota Way (a book )written by

Dr. Jeffrey Liker

Frederick Winslow Taylor-

Frank B.Gilbreth

Elton Mayo

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Japanese Engineer ,Who developed Toyota Production System is

Taiichi Ohno

Elton Mayo

Henry Fayol

Henry Gantt

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The average time between the start of production of one unit and the start of production of the next unit, when these production starts are set to match the rate of customer demand is called as

Takt Time

Lead Time

Pull System

Jidoka

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The concept of ________ is “Automatic detection of problems or defects at an early stage and proceed with the production only after resolving the problem at its root cause”.

Pull System

Jidoka

Lead time

Takt Time

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?