Machine Availability & Reliability
Authored by Henkel Indonesia
Specialty, Other
Professional Development
Used 10+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following is NOT part of the 4 new tasks that Autonomous Maintenance practice introduces to the Operation?
Apply new analysis tools
Support to develop new equipment
Educate and train operators
Develop know-how to become a specialist
Learn how to operate the machine
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
There are 7 types of Abnormalities as above list. From the options below, choose the abnormality that is missing.
Source of cleaning
Source of contamination
Source of breakdown
Source of Abnormality
Source of Repair
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following is NOT an objective from carrying out cleaning/ inspection when implementing AM?
Prevent forced deterioration
Expose hidden abnormalities
Trace sources of dirt, dust, etc.
Detect abnormalities
Identify machine lifespan
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
From the list below select the reaction that is most likely NOT caused when a machine incurs problems :
Overtime
Fire Fighting
Progress chasers
Flexibility
Additional Shifts
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Autonomous Maintenance is applied to identify 2 types of deterioration, Natural Deterioration & Forced Deterioration. From the list below, select the reason that DO NOT contribute to Forced Deterioration :
Design Weakness
Corrosion
Environment
Failure to maintain basic conditions
Conditions of use not needed
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Choose the best sentence to define changeover time?
The time from running the last product to the time of running the current product
The time between the machine was functional to the time the machine breakdown
The time from running qualified product at the standard rate of the last batch to running qualified product at the standard rate of the next batch
The time from running the machine when operation start to the time when the machine is switched off upon completion of the operation
The time between startup of the operation until the time the operations ends for the day
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following are Tools used for improving the changeover process?
Spaghetti Diagram
Action Log
Changeover Checklist
Video camera and stopwatch
All of above
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?