1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Below is the purposes of plant and instrument air system except:
Maintenance activities
Pneumatic control valves
Non-explosion motor purge
Cable seal gas
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of air compressor using at RGTP and how many stages it has?
Centrifugal air compressor, 3 stages
Rotary crew type air compressor, 2 stages
Reciprocating air compressor, 2 stages
Axial air compressor, 3 stages
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the capacity of wet air receiver?
72.9 m3
75.3 m3
945 Nm3/hr
950 Nm3/hr
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the element that is used to absorb the moisture in the Air Dryer?
Silica Gel
Activated Alumina
Activated Carbon
Molecular Sieves
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many Air Dryer bed in the Instrument Air System?
4
5
6
7
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If 54-PZT-2001A/B/C in the instrument air system triggered. What types of ESD will be activated?
ESD 1
ESD 2
ESD 3
ESD 4
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the setting pressure for running compressor to load & unload in remote selector?
Load = 9.0 & Unload = 9.6
Load = 9.0 & Unload = 9.5
Load =6.5 & Unload = 7.5
Load = 5.5 & Unload = 6.5
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?