OREDE-P RGTP Unloading, Reloading and GUCD

OREDE-P RGTP Unloading, Reloading and GUCD

Professional Development

11 Qs

quiz-placeholder

Similar activities

Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Boosted Cold Water Systems L3P1.U5.LO2.1.p3.

Professional Development

10 Qs

OREDE-P RGTP Unit 35: Open Rack Vaporizer

OREDE-P RGTP Unit 35: Open Rack Vaporizer

Professional Development

7 Qs

AC Drive Characteristics 1

AC Drive Characteristics 1

9th Grade - Professional Development

10 Qs

OREDE-P RGTP Unit 62 : Flare System

OREDE-P RGTP Unit 62 : Flare System

Professional Development

7 Qs

pp3 Central Heating Systems Quiz

pp3 Central Heating Systems Quiz

Professional Development

10 Qs

Noxious Liquid Substances Quiz

Noxious Liquid Substances Quiz

Professional Development

15 Qs

Gear and Heat Exchanger Maintenance Quiz

Gear and Heat Exchanger Maintenance Quiz

Professional Development

15 Qs

PP4 hot water Localized Instantaneous 1.2

PP4 hot water Localized Instantaneous 1.2

Professional Development

13 Qs

OREDE-P RGTP Unloading, Reloading and GUCD

OREDE-P RGTP Unloading, Reloading and GUCD

Assessment

Quiz

Physics

Professional Development

Easy

Created by

faris shakir

Used 7+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many modes that we have at RGTP

3

4

5

2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below list of RGTP mode, except

Unloading mode

Reloading mode

Holding mode

GUCD Mode

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is design capacity LNGC in the range for the unloading operation?

20,000m3 ~ 300,000m3

40,000m3 ~ 200,000m3

130,000m3 ~ 270,000m3

132,000m3 ~ 600,000m3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How we transfer LNG from LNG Tank to Vaporizer

BOG Compressor

Seawater Pump

In-Tank Pump & HP Pump

Seawater Booster Pump

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How we manage excess BOG generated during holding, unloading, and reloading mode

Flaring

Send-out to pipeline

Compressed to recondenser

Cooling down truck tanker

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main activity during holding mode?

Reloading

Unloading

Send-out to pipeline

GUCD

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why we must monitor the density LNGC and LNG Tank before unloading operation

To decide top or bottom filling to prevent rollover

To decide in-tank pump that we want to use

To increase LNG Cargo Pump flow rate

To increase send-out base on daily nomination

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?