safe isolation

safe isolation

Professional Development

9 Qs

quiz-placeholder

Similar activities

172 Engines L2 L2

172 Engines L2 L2

Professional Development

10 Qs

Exam 3 - Jones - Sync Session Questions

Exam 3 - Jones - Sync Session Questions

Professional Development

12 Qs

141 S20 A1

141 S20 A1

Professional Development

12 Qs

Safety Ex Session One Day Three

Safety Ex Session One Day Three

Professional Development

13 Qs

BEE_2

BEE_2

Professional Development

10 Qs

Level 1 Spark ignition

Level 1 Spark ignition

Professional Development

11 Qs

Saubhagya Rbl-08-04-20

Saubhagya Rbl-08-04-20

KG - Professional Development

8 Qs

Circuits of filter and regulators

Circuits of filter and regulators

Professional Development

14 Qs

safe isolation

safe isolation

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Duncan Brignell

Used 87+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before you start the safe isolation procedure you should

seek permission

seek admission

turn off all breakers

prove yourself

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the first step in safe isolation?

have a cup of tea

test the circuit

identify the circuit

use a proving unit

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what should you do before turning off the main isolator?

turn off all the MCB's to power down the board

pray

turn all the lights in the house on

use a proving unit

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what do you use to confirm the power is off?

A proving unit

A low resistance ohm meter

a volt stick

An approved voltage indicator

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how can you check your voltage indicator is working properly?

use a proving unit

test it with another voltage indicator

you don't need to

a low resistance ohm meter

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the name of the HSE guidance on voltage testers?

HS2

BS7671

GS38

HSE 63

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the correct order for testing between conductors?

L-E, N-E, N-L

L-N, L-E, N-E

L-L, N-N, E-E

Bonding - CPC

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how can we make sure no one can turn on a circuit we are working on?

Use a lock off kit and a sign

don't worry about it

hope

disconnect all the circuits

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

And where is the key?

on top of the CCU

In the boss's pocket

in the van

in your pocket