POE Test 1

POE Test 1

9th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

Determine the basic operating conditions of simple vapour compre

Determine the basic operating conditions of simple vapour compre

12th Grade

20 Qs

EOY Microsoft Word Review Part 5

EOY Microsoft Word Review Part 5

9th - 12th Grade

22 Qs

Problem solving VB.NET PREP 3 First chapter

Problem solving VB.NET PREP 3 First chapter

9th - 12th Grade

20 Qs

CPA Prelims JY 2022

CPA Prelims JY 2022

8th Grade - Professional Development

20 Qs

EDP Pretest

EDP Pretest

12th Grade

17 Qs

14S, 13T topics 1-20

14S, 13T topics 1-20

12th Grade

15 Qs

CompTIA Network+ v1.0 (N10-008) Quiz

CompTIA Network+ v1.0 (N10-008) Quiz

12th Grade

20 Qs

S2 CPA EOY Revision 1 (WSSS 2018)

S2 CPA EOY Revision 1 (WSSS 2018)

10th Grade

20 Qs

POE Test 1

POE Test 1

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Used 27+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Leadership model in which a leader is positioned closely to all members of the team and has short, direct communication:

Traditional

Participative

Flat

Consultant

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The total time needed to plan, prototype, and procure materials and to create marketing strategies, devise tooling, begin production and bring new product to the market is the definition of:

Time to Market

Concurrent Engineering

Speed

All of these are correct

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Forming stage is when:

Members pitch in to help one another

Feelings of cooperation develop

Team members become acquainted

All of these are correct

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Shared expectations/rules within the team are established during:

Performing

Storming

Adjourning

Norming

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This stage is when a leader may become indistinguishable from the rest of the group, as all members are busy with executing tasks:

Performing

Norming

Storming

Adjourning

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Everyone works together (parallel operation) with marketing, manufacturing, and procurement personnel involved from the design of a product:

Traditional Engineering Practice

Time to Market

Concurrent Engineering

International Tactics

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Optimization simply stated is:

Blend of engineer’s best practices

Problem solving and processes

Doing the most with least

Means of achieving a desired result

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?