POE Test 1

POE Test 1

9th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

POE Hydraulic Power

POE Hydraulic Power

10th Grade

20 Qs

Audio Video Certification Prep General knowledge

Audio Video Certification Prep General knowledge

12th Grade

20 Qs

Logos

Logos

9th - 10th Grade

18 Qs

Photoshop tools

Photoshop tools

6th Grade - Professional Development

16 Qs

History of Engineering

History of Engineering

9th Grade

20 Qs

วิทยาการคำนวณ ม.6 (หน่วย 2)

วิทยาการคำนวณ ม.6 (หน่วย 2)

1st Grade - University

20 Qs

Hydraulic brake system

Hydraulic brake system

10th - 12th Grade

15 Qs

Ulangan TIK

Ulangan TIK

12th Grade

20 Qs

POE Test 1

POE Test 1

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Practice Problem

Medium

Used 27+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Leadership model in which a leader is positioned closely to all members of the team and has short, direct communication:

Traditional

Participative

Flat

Consultant

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The total time needed to plan, prototype, and procure materials and to create marketing strategies, devise tooling, begin production and bring new product to the market is the definition of:

Time to Market

Concurrent Engineering

Speed

All of these are correct

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Forming stage is when:

Members pitch in to help one another

Feelings of cooperation develop

Team members become acquainted

All of these are correct

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Shared expectations/rules within the team are established during:

Performing

Storming

Adjourning

Norming

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This stage is when a leader may become indistinguishable from the rest of the group, as all members are busy with executing tasks:

Performing

Norming

Storming

Adjourning

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Everyone works together (parallel operation) with marketing, manufacturing, and procurement personnel involved from the design of a product:

Traditional Engineering Practice

Time to Market

Concurrent Engineering

International Tactics

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Optimization simply stated is:

Blend of engineer’s best practices

Problem solving and processes

Doing the most with least

Means of achieving a desired result

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Instructional Technology