Pre-fabrication system

Pre-fabrication system

University

10 Qs

quiz-placeholder

Similar activities

SPP 200 - Code of Ethics (RA 9266)

SPP 200 - Code of Ethics (RA 9266)

University

10 Qs

FBC: Introduction to FBC

FBC: Introduction to FBC

University

12 Qs

L1: Overview of Building Science & Services I

L1: Overview of Building Science & Services I

University

10 Qs

MYCESMM2 - CLASS E & F

MYCESMM2 - CLASS E & F

University

14 Qs

Unidad 1

Unidad 1

University

10 Qs

Philippine History of Architecture

Philippine History of Architecture

7th Grade - Professional Development

15 Qs

History of Malaysian Architecture

History of Malaysian Architecture

University

8 Qs

Building Services 2

Building Services 2

University

10 Qs

Pre-fabrication system

Pre-fabrication system

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

Cikgu Wan

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Common pre-fabrication systems are ...

Modular system

Panelised system

Pre-cut system

Post-cut system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This systems require more assembly on site and more labour on site.

Modular system

Panelised system

Pre-cut system

Post-cut system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This systems require less assembly on site and less labour on site.

Modular system

Panelised system

Pre-cut system

Post-cut system

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Advantages of pre-fabrication are ...

Less waste generated and tidier construction site

Construction time can be shorter

Less labour exposure to hazardous working condition on construction site

Cheaper transportation cost

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Disadvantages of pre-fabrication system are ...

Require heavy machineries to handle large components

Jointing could fail or leak if not properly done

Mishandling during transportation could damage the pre-fab components

Not suitable for construction site at congested urban area

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Pre-fabrication systems shown in photo is ...

Modular system

Panelised system

Pre-cut system

Post-cut system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Pre-fabrication systems shown in photo is ...

Modular system

Panelised system

Pre-cut system

Post-cut system

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?