Current Affairs 1

Current Affairs 1

7th - 10th Grade

12 Qs

quiz-placeholder

Similar activities

NYGH International Friendship Day Quiz (Upp Sec)

NYGH International Friendship Day Quiz (Upp Sec)

9th - 10th Grade

15 Qs

25.5 Three Gorges Dam Quizizz

25.5 Three Gorges Dam Quizizz

10th Grade

10 Qs

Hydro Energy 2022

Hydro Energy 2022

KG - Professional Development

10 Qs

Whitebox Solar: Solar Panel Technology

Whitebox Solar: Solar Panel Technology

9th - 12th Grade

12 Qs

Renewable Resources Vocabulary

Renewable Resources Vocabulary

7th Grade

10 Qs

Inventions

Inventions

8th - 12th Grade

10 Qs

World sends oxygen aid for India's COVID crisis

World sends oxygen aid for India's COVID crisis

8th Grade

10 Qs

California's Solar Farms

California's Solar Farms

9th - 12th Grade

10 Qs

Current Affairs 1

Current Affairs 1

Assessment

Quiz

English, Science, Education

7th - 10th Grade

Medium

Created by

Jun Hui Lee

Used 4+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

READ THE OPTIONS CAREFULLY. Why did Singapore build a solar farm in Tengeh Reservoir? (Choose the best answer)

To increase Singapore's carbon emissions

To increase Singapore's carbon dioxide

To reduce Singapore's carbon footprint

To increase Singapore carbon footprint

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the maximum capacity of the Tengeh Reservoir Floating Solar Farm?

40 megawatts

50 megawatts

60 megawatts

70 megawatts

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The Tengeh Reservoir Floating Solar Farm is a joint project by _____ and ______.

NEA and Sembcorp

HDB and PUB

Sembcorp and MOE

Sembcorp and PUB

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The carbon offset by the Tengeh Reservoir Floating Solar Farm is equivalent to taking _____ cars off the road.

6000

7000

8000

9000

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Why does Singapore have to build a solar farm on water? (You may choose more than one answer)

The water helps to generate more power.

Singapore has very little land space.

Singapore wants to produce hydroelectricity with solar energy.

Singapore has a lot of water space.

Singapore has very little roof space.

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which is the second step in installing the solar panels in Tengeh Reservoir Floating Solar Farm?

Media Image
Media Image
Media Image

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Why does Singapore have to split the solar panel assembly area into different parts? Choose the best answer.

This is to increase worker efficiency.

This is to increase worker motivation.

This is to reduce the chances of workers catching Covid-19.

This is to ensure that work can continue in other areas if one area has a Covid-19 case.

This is to ensure workers don't feel scared to contract Covid-19.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?