CIS7

CIS7

12th Grade

5 Qs

quiz-placeholder

Similar activities

Pengurusan diri: Tatasusila Bersosialisasi

Pengurusan diri: Tatasusila Bersosialisasi

12th Grade

10 Qs

Kursus Rehabilitasi Berasaskan Komuniti

Kursus Rehabilitasi Berasaskan Komuniti

1st Grade - University

6 Qs

KRITERIA PENILAIAN DONAT

KRITERIA PENILAIAN DONAT

9th - 12th Grade

10 Qs

COCA02 01 KEJUJURAN DAN INTEGRITI

COCA02 01 KEJUJURAN DAN INTEGRITI

12th Grade

8 Qs

cooling system theory

cooling system theory

9th - 12th Grade

10 Qs

Hourly Wage Quiz

Hourly Wage Quiz

9th - 12th Grade

10 Qs

Mail

Mail

3rd Grade - University

10 Qs

KUIZ ALAM SEKITAR

KUIZ ALAM SEKITAR

10th - 12th Grade

10 Qs

CIS7

CIS7

Assessment

Quiz

Special Education

12th Grade

Hard

Created by

Syiera Syiera

Used 1+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Apa itu standard Industri Pembinaan CIS7?

digunakan sebagai syarat/tatacara penilaian untuk kualiti mutu kerja dalam pembinaan

Digunapakai di seluruh dunia

Standard untuk menilai bahan

2.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Kenapa standard CIS 7 dibangunkan?

Menutup ruangan kosong antara standard Pembinaan yang wujud di dalam malaysia

Sebagai standard kepada kualiti mutukerja di dalam pembinaan

Sebagai panduan untuk memilih bahan yang berkualiti

Sebagai standard untuk prosedur menjalankan penilaian QLASSIC

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

Based on STANDARD INDUSTRI PEMBINAAN (CIS 7:2014) What is the use of Quality Assessment system for Building Construction Works?

to benchmark the level of quality of the construction industry in Malaysia

to complement the normal contractual drawing and specification in a project.

to cover four main component which is structural works, architural works,M&E works and external works.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Quality standard for Building Construction are divided into four main component except :

Structural Works

Architectural Worked

JKR specifications

M&E Works

External Works

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Architectural works deals with__________.

Preliminary

Finishes

Cost