Search Header Logo

Professional Practice 1

Authored by Alyssa Marie

Architecture

University

Used 83+ times

Professional Practice 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

70 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What will happen if the owner failed to comply to the order of the Building Official in case if appeal, to repair, renovate, demolish and remove the building/structure or any part thereof

Building Official shall cause the building or structure to be repaired, renovated, demolished and removed partly with all expenses chargeable to the owner.

Building Official shall cause the building or structure to be repaired, renovated, demolished and removed partly or wholly without charging the owner.

Building Official shall cause the building or structure to be repaired, renovated, demolished and removed wholly with all expenses chargeable to the owner.

Building Official shall cause the building or structure to be repaired, renovated, demolished and removed partly or wholly with all expenses chargeable to the owner.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is NOT a ground for suspension or revocation of Building Permit?

Errors found in the plans and specifications

Non-compliance with the provisions of the code or any rules or regulations

Changes, modifications, and alterations in the design plans during the construction phase

Incorrect or inaccurate data or information supplied

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A kind of hazard of dangerous buildings where any portion or member or appurtenances thereof is likely to fall, or to become detached or dislodged or to collapse and thereby injure persons or damage property

Fire Hazard

Structural Hazards

Unsafe Electrical Wiring

Architectural Deficiency

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The engineer/s and/or architect who drew up the plans and specifications for a building/structure is liable for damages if within ___ years from the completion of the building/structure

5

20

15

10

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

For the construction of 3 or more storey buildings, which analysis/test are needed?


I. Boring Load Test

II. Plate Load Test

III. Seismic Analysis

IV. Surveyor's Analysis

I, II, & III

All of the above

I, II, & IV

I & II

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

If the guilty violator of the National Building Code is an alien, he shall immediately be deported after?

Payment of fine and/or service of his sentence

Application for Criminal Conviction

Supreme Court Intervention

Hearing of his Criminal Case

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Design and construction law on safety and protection for "Enhancing the Mobility and Disabled Persons". It was signed into law last February 23, 1983 and the Implementing Rules and Regulation (IRR) latest revision was issued April 30, 2005

BP 9263

BP 344

PD 1096

RA 6541

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?