DAY 2 OM

DAY 2 OM

1st Grade - University

5 Qs

quiz-placeholder

Similar activities

PENDIDIKAN KEWARGANEGARAAN TEMA 7 KELAS 1

PENDIDIKAN KEWARGANEGARAAN TEMA 7 KELAS 1

1st Grade

10 Qs

PRODUCT CONNECTIVITY

PRODUCT CONNECTIVITY

1st - 3rd Grade

10 Qs

Physical Instability

Physical Instability

12th Grade

10 Qs

Quiz_Unidad_7_8_ATA_Aba_1009

Quiz_Unidad_7_8_ATA_Aba_1009

University

9 Qs

Slowness

Slowness

5th Grade

10 Qs

SLA Awareness Quiz (Set A)

SLA Awareness Quiz (Set A)

1st - 3rd Grade

5 Qs

semántica

semántica

1st Grade

6 Qs

follow up 1

follow up 1

1st - 5th Grade

5 Qs

DAY 2 OM

DAY 2 OM

Assessment

Quiz

Other

1st Grade - University

Hard

Created by

sara abdelkaders925@gmail.com

Used 5+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which is missing from the following normal cycle

Wo Request – Check Compo - …………. – Allow assign cpe

a- Call back to crm

a- Wo problem

a- Network Activation

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2- TE Problem SLA is

a- 5 working Days

a- 7 working days

a- 3 Working days

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

3-In which status WeConfigure service on system

a- Network activation configuration

a- Call back to crm

a- Check compo

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

4-In case there is a problem happened during the “OM” normal cycle, the SLA wil be calculated from :

a- Order creation

a- Last TT

a- The next activity after solving the problem

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

5-SLA will be calculated hourly not from the next day

a- True

a- False