A water tank is two-fifth full.Pipe A can fill a tank in 10 minutes and pipe B can empty it in 6 minutes.If both the pipes are open,how long will it take to empty or fill the tank completely?
MUJ_QA_02

Quiz
•
Professional Development
•
Professional Development
•
Hard
Rajeev Agarwa
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
6 min.to empty
6 min.to fill
9 min.to empty
9 min.to fill
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A pump can fill a tank with water in 2 hours. Because of a leak, it took 2 1/3 hours to fill the tank. The leak can drain all the water of the tank in:
7 hours
8 hours
12 hours
14 hours
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A booster pump can be used for filling as well as for emptying a tank. The capacity of the tank is 2400 cubic meter . The emptying capacity of the tank is 10 cubic meter per minute higher than its filling capacity and the pump needs 8 minutes lesser to empty the tank than it needs to fill it. What is the filling capacity of the pump?
50 cubic meter per min
60 cubic meter per min
72 cubic meter per min
80 cubic meter per min
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Pipes A and B can fill a tank in 10 hours and 40 hours, respectively. C is an outlet pipe attached to the tank. If all the three pipes are opened simultaneously, it takes 80 minutes more time than what A and B together take to fill the tank. A and B are kept opened for 7 hours and then closed and C was opened. C will now empty the tank in:
49.5 hours
39.2 hours
42 hours
49 hours
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A sump is filled by three tankers with uniform flow. The first two tankers operating simultaneously fill the sump in the same time during which the sump is filled by the third tanker alone. The second tanker fills the sump 5 hours faster than the first tanker and 4 hours slower than the third tanker. The time required by the first tanker is:
16hours
9hours
10hours
15hours
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A father can work at the same rate as that of his two sons working together. If one son can complete a job in 6 days and the other son can complete the same job in 12 days. Find the time taken by father to complete the job.
2
5
7
9
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
3 workers Peroola, Rahul and Prashant can complete a piece of work in 6 days. Peroola takes 15 days less than Rahul to complete the same work. Find in how many days will Prashant complete the whole work alone with 75% of his original efficiency, if Rahul can complete the work alone in 35 days?
560/37 days
499/36 days
361/17 days
555/43 days
Create a free account and access millions of resources
Similar Resources on Quizizz
10 questions
Aptitude Quiz-5 ( Time, Speed & Distance)

Quiz
•
Professional Development
10 questions
Trailblazers - Monthly TRIVIA- Aug 2023

Quiz
•
Professional Development
10 questions
Kristen and Jordan Baby Shower

Quiz
•
Professional Development
15 questions
Burgers

Quiz
•
Professional Development
15 questions
Sherrrod Faculty Handbook

Quiz
•
Professional Development
15 questions
UOBM Package & Entitlement

Quiz
•
Professional Development
15 questions
DAY 2

Quiz
•
Professional Development
10 questions
ESOP

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade