14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Which of the following is a MAJOR task of evaluating exit criteria and reporting?
Writing a test summary report for stakeholders
Logging the outcome of test execution
Repeating test activities as a result of action taken for each discrepancy.
Evaluating testability of the requirements and system
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Which of the following is not a part of Configuration Management?
Controlled library access
Record of changes to documentation over time
Auditing conformance to ISO9001
Identification of test versions
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A test engineer is testing a Video Player (VCR), and logs the following report:
Title: Fast Forward stops after 2 minutes. It happens every time
Expected result: Fast forward continues until the end of the tape
Severity: High
Priority: Urgent
What important information did the engineer leave out?
Identification (Software and hardware) of the VCR
Actual result
History of the report
Ideas for the test case improvement
4.
MULTIPLE SELECT QUESTION
2 mins • 1 pt
Multiple Answers Question!!!
Which of the following can be root cause of a bug in a software product?
(I) The project had incomplete procedures for configuration management.
(II) The time schedule to develop a certain component was cut.
(III) The specification was unclear
(IV) Use of the code standard was not followed up
(V) The testers were not certified
5.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Which of the following is NOT part of a high-level test plan?
Functions not to be tested.
Environmental requirements.
Analysis of Specifications.
Entry and Exit criteria
6.
MULTIPLE SELECT QUESTION
2 mins • 1 pt
Multiple Answers Question!!!
In a risk-based approach, the risks identified may be used to:
Note: Select only the answers that are true!!!!
i. Determine the test technique to be employed
ii. Determine the extent of testing to be carried out
iii. Prioritise testing in an attempt to find critical defects as early as possible.
iv. Determine the cost of the project
7.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A project that is in the implementation phase is six weeks behind schedule.
The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for this product.
Which of the following actions would bring this project back on schedule?
Eliminate some of the requirements that have not yet been implemented.
Add more engineers to the project to make up for lost work.
Ask the current developers to work overtime until the lost work is recovered.
Hire more software quality assurance personnel.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?