Unit 5 Test Management

Unit 5 Test Management

1st - 10th Grade

14 Qs

quiz-placeholder

Similar activities

Grade 4 Revision

Grade 4 Revision

4th Grade - University

11 Qs

AI Project Cycle

AI Project Cycle

8th - 10th Grade

10 Qs

ICT-9 Computer Servicing System

ICT-9 Computer Servicing System

9th - 10th Grade

10 Qs

Illus: Dom1b

Illus: Dom1b

9th - 12th Grade

15 Qs

Chapter 1: Client and the Designer

Chapter 1: Client and the Designer

10th - 12th Grade

18 Qs

Engineering Design Process

Engineering Design Process

2nd - 5th Grade

15 Qs

Code.org: Unit 1 Lesson 1 - 3

Code.org: Unit 1 Lesson 1 - 3

7th - 10th Grade

13 Qs

Unit 5 Test Management

Unit 5 Test Management

Assessment

Quiz

Computers

1st - 10th Grade

Hard

Created by

Fernando Martínez

Used 4+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is a MAJOR task of evaluating exit criteria and reporting?

Writing a test summary report for stakeholders

Logging the outcome of test execution

Repeating test activities as a result of action taken for each discrepancy.

Evaluating testability of the requirements and system

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is not a part of Configuration Management?

Controlled library access

Record of changes to documentation over time

Auditing conformance to ISO9001

Identification of test versions

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A test engineer is testing a Video Player (VCR), and logs the following report:


Title: Fast Forward stops after 2 minutes. It happens every time


Expected result: Fast forward continues until the end of the tape


Severity: High

Priority: Urgent


What important information did the engineer leave out?

Identification (Software and hardware) of the VCR

Actual result

History of the report

Ideas for the test case improvement

4.

MULTIPLE SELECT QUESTION

2 mins • 1 pt

Multiple Answers Question!!!


Which of the following can be root cause of a bug in a software product?

(I) The project had incomplete procedures for configuration management.

(II) The time schedule to develop a certain component was cut.

(III) The specification was unclear

(IV) Use of the code standard was not followed up

(V) The testers were not certified

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is NOT part of a high-level test plan?

Functions not to be tested.

Environmental requirements.

Analysis of Specifications.

Entry and Exit criteria

6.

MULTIPLE SELECT QUESTION

2 mins • 1 pt

Multiple Answers Question!!!


In a risk-based approach, the risks identified may be used to:


Note: Select only the answers that are true!!!!

i. Determine the test technique to be employed

ii. Determine the extent of testing to be carried out

iii. Prioritise testing in an attempt to find critical defects as early as possible.

iv. Determine the cost of the project

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A project that is in the implementation phase is six weeks behind schedule.


The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for this product.


Which of the following actions would bring this project back on schedule?

Eliminate some of the requirements that have not yet been implemented.

Add more engineers to the project to make up for lost work.

Ask the current developers to work overtime until the lost work is recovered.

Hire more software quality assurance personnel.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?