Penjadwalan Proyek dan Sumber Daya

Penjadwalan Proyek dan Sumber Daya

12th Grade

7 Qs

quiz-placeholder

Similar activities

Sience

Sience

1st Grade - Professional Development

7 Qs

Easter Quiz

Easter Quiz

9th - 12th Grade

8 Qs

The History of Science

The History of Science

12th Grade

10 Qs

POST-TEST: Sources of Energy

POST-TEST: Sources of Energy

12th Grade

10 Qs

Science Quiz

Science Quiz

12th Grade

10 Qs

KSSM_FORM 5_CHAPTER 6_SUBCHAPTER 6.1_PART 1

KSSM_FORM 5_CHAPTER 6_SUBCHAPTER 6.1_PART 1

KG - 12th Grade

8 Qs

DRRR Q4

DRRR Q4

12th Grade

10 Qs

MCCB Quiz

MCCB Quiz

12th Grade

10 Qs

Penjadwalan Proyek dan Sumber Daya

Penjadwalan Proyek dan Sumber Daya

Assessment

Quiz

Science

12th Grade

Practice Problem

Easy

Created by

lina gozali

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

5 sec • 1 pt

What resources are considered in project scheduling?

Raw material

Components that are bought and produced

Skilled human resources

Space used for production or inventory

Availability of capital

2.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

What is the impact of limited resources on scheduling?

It can lead to implementation issues

It has no effect on costs

It simplifies the scheduling process

It allows for more flexibility in project planning

3.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

What is resource allocation?

Assignment of limited resources to project activities

Balancing resources across multiple projects

Maximizing the use of available resources

Scheduling resources based on availability

4.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

What does float mean in project scheduling?

The amount of time an activity can be delayed

The total time required to complete a project

The time taken to complete a single task

The time buffer for resource allocation

5.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

What is the significance of the latest time in scheduling?

It helps in determining the critical path

It is used to allocate resources effectively

It indicates the earliest start time for activities

It is irrelevant to project scheduling

6.

OPEN ENDED QUESTION

5 sec • 1 pt

What is the minimum number of resources required to achieve the time?

Evaluate responses using AI:

OFF

7.

OPEN ENDED QUESTION

5 sec • 1 pt

What is the minimum time required to complete the project?

Evaluate responses using AI:

OFF