Site surveying

Site surveying

University

15 Qs

quiz-placeholder

Similar activities

Building Framing Systems

Building Framing Systems

University

13 Qs

SGD2333 - Stairs

SGD2333 - Stairs

University

20 Qs

Planning 3 (CTTO)

Planning 3 (CTTO)

University

15 Qs

Guess the Building (Hard)

Guess the Building (Hard)

KG - Professional Development

10 Qs

Pre intermediate

Pre intermediate

4th Grade - University

15 Qs

Cost Estimating Theory

Cost Estimating Theory

12th Grade - University

16 Qs

Introduction to Architecture

Introduction to Architecture

11th Grade - Professional Development

11 Qs

16AR452 Architectural Conservation

16AR452 Architectural Conservation

University

20 Qs

Site surveying

Site surveying

Assessment

Quiz

Architecture

University

Hard

Created by

Lakshmi Priya

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The spatial location of an actual or planned structure or set of structures is termed as

Plot

Site

2.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Elements of site plan are

Building foot print

Pathways and landscape

Parking and services

Ground floor plan

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What are the measurements taken in surveying

Distance, height

Angle and levels

Distance, angle, levels, relative position and relative heights

Relative heights and relative position

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The survey in which the surface of the earth is taken as a curvature

Plane survey

Location survey

Geodetic survey

Reconnaissance survey

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Tacheometric survey uses tacheometer device which measures

Length in between two points

angle between two points

height difference between two points

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Offset is the measurement

Distance of the object from survey line which is perpendicular or oblique

Horizontal distance from the object

The line joining two survey stations

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The equipment used to mark the sighting station is called

Cross staff

Ranging rod

Clinometer

Line ranger

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?