10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Safety Critical Protection Device (SCPD) is the ... (IPS) and/or Safety Device that provides barrier to prevent or limit the effects of a hazard release.

Instrumented Process Safety

Isolated Protective System

Instrumented Protective System

Insulated Protective System

Answer explanation

Instrumented Protective System is the device or safeguarding that provides protection, detection or mitigation when hazard release. This covers pneumatic, hydraulic and electrical instrument.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the duration of bypass for Level 3 Validity in bypassing SCPD?

Less than 24 hours

Less than 7 days

More than 7 days but less than 21 days

More than 21 days but less than 12 weeks

Answer explanation

Media Image

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the validation frequency of Level 2 Validity for Bypassing of SCPD?

Daily

Weekly

Bi-weekly

Monthly

Answer explanation

Media Image

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For P1/P2 jobs, which of the following is not the responsibility of Production Technical Advisor (TA)?

Revalidate SCPD Bypass Certificate, even during Silent Hours

Fill up & Obtain Approval for SCPD Bypass Certificate

Scribe & Obtain Approval for Risk Assessment

Coordinate Risk Assessment

Answer explanation

Media Image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a role of a B-TA, with regards to SCPD Bypass Risk Assessment LOA?

Endorser for Low Risk Rating

Endorser for Medium Risk Rating

Reviewer for High Risk Rating

Approver for Low Risk Rating

Answer explanation

Media Image

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PTW is not required for the bypassing work of SCPD (PTW #1) if they are using the following methods, EXCEPT

Low Risk Rating based on Risk Assessment

Operation/Maintenance Override Switches (OOS/MOS)

Software Override

Mechanical Override Device (e.g. isolation valve)

Answer explanation

Media Image

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

TRUE or FALSE

Risk Assessment (RA) shall be revisited for escalation of bypass duration to Level 2 and Level 3 OR if any changes to site condition that may head to changes to source of hazards.

True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?