OFFSITE CONSTRUCTION

OFFSITE CONSTRUCTION

Professional Development

8 Qs

quiz-placeholder

Similar activities

Dashboard Assessment

Dashboard Assessment

Professional Development

10 Qs

Scheduled Waste Management

Scheduled Waste Management

Professional Development

11 Qs

(NGOPI DARAT)Ngbrol Prihal Implemntasi Design Cpat &Akurat

(NGOPI DARAT)Ngbrol Prihal Implemntasi Design Cpat &Akurat

Professional Development

10 Qs

Part 1: Safety Principles

Part 1: Safety Principles

Professional Development

10 Qs

Google Sites

Google Sites

Professional Development

6 Qs

Wound Healing and Repair

Wound Healing and Repair

Professional Development

10 Qs

LARO 21: Synergy - Professional Practice

LARO 21: Synergy - Professional Practice

Professional Development

10 Qs

Cycle 4: Session 9 Review.

Cycle 4: Session 9 Review.

Professional Development

13 Qs

OFFSITE CONSTRUCTION

OFFSITE CONSTRUCTION

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

JIMMY NEBRIDA

Used 3+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______________ is that part of the construction process that is carried out away from the building site (such as in a factory), and which would

normally be carried out on site.”

offsite construction

onsite construction

precast construction

all of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Another term of offsite construction are modular construction, pre fabricated construction, and in situ construction.

true

false

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Three-dimensional units produced in a factory, fully fitted out before being transported to site and stacked onto prepared foundations to form the building is volumetric construction

true

false

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

___________ units built in a factory and transported to site for assembly into a three-dimensional structure or to fit within an existing structure

cassettes

flat panel

concrete panel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________________ structural wall panels, which can include cladding (often bricks or brick slips), insulation materials, windows and doors.

cassettes

flat panel

concrete panel

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Volumetric construction is most efficient when used for large numbers of identical units, as may be found in flats.

true

false

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

panels delivered to site where insulation, windows, services and linings are fitted. All structural components are visible

open panels

closed panels

concrete panels

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

panels based on a structural framing system (such as the type used for open panel systems), which can have factory fitted windows, doors, services, internal wall finishes and external cladding

open panels

closed panels

concrete panels