Sea Perch Construction

Sea Perch Construction

5th - 8th Grade

6 Qs

quiz-placeholder

Similar activities

VEX Competition Bot

VEX Competition Bot

6th - 8th Grade

10 Qs

Motores y actuadores de electrodomésticos.

Motores y actuadores de electrodomésticos.

8th - 9th Grade

10 Qs

6th Grade Animation Quiz

6th Grade Animation Quiz

6th Grade

8 Qs

History of Wires

History of Wires

6th - 8th Grade

10 Qs

Robotics Spike Prime Sensors and motors quiz

Robotics Spike Prime Sensors and motors quiz

6th - 8th Grade

11 Qs

car logos

car logos

1st Grade - Professional Development

9 Qs

Q3_W1_L1

Q3_W1_L1

6th Grade

10 Qs

The Automobile

The Automobile

8th Grade - Professional Development

10 Qs

Sea Perch Construction

Sea Perch Construction

Assessment

Quiz

Specialty

5th - 8th Grade

Medium

Created by

THOMAS BUECHE

Used 11+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FRAME: What material is used to make the Sea Perch frame?

Polybuterol

PB&J

PVC

Styrofoam

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FRAME Why are holes drilled in the high and low points of the Sea Perch frame?

To make it positively buoyant.

To allow water to fill the inside of the frame.

For electrical conductivity.

To reduce weight.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FRAME: What is used to attach the plastic mesh to the Sea Perch frame?

Zip ties

Super Glue

Rivets

Bondo

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MOTOR PREP: Which of the following motor preparation steps is performed before all the others?

Cover the terminal end with tape.

Solder the wires to the terminals.

Cover the sides with tape.

Mark the positive electrical terminal.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MOTOR PREP: Which of the following motor preparation steps is performed before the others?

Strip the insulation off the wires.

Solder wires to the terminals.

Drill holes in the canister and caps.

Insert wires through the cap.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

THRUSTERS: Which of these steps for constructing the thrusters comes before the others?

Insert the motor into the canister shaft first.

Install the canister cap.

Partially fill the canister with wax.

Completely fill the canister with wax.