
Building System Design
Authored by metzilou tigbabao
Design
University
Used 48+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
A building permit issued under the provisions of the National Building Code shall expire and become null and void if
Building or work not commenced within a period of 3 months after issuance of building permit
Building or work is suspended or abandoned at any time after it has been commenced for a period of 1 year
Building or work not commenced within a period of 120 days after issuance of building permit
Building or work is suspended or abandoned at any time after it has been commencing for a period of 120 days
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following minor constructions is NOT exempted from building permits?
Garden masonry walls other than party walls not exceeding 1.20 meters in height, footpaths, residential garden walks and/or driveways
Addition of open terraces or patios resting directly on ground, not exceeding 20 sq. m. in total floor area, exclusively for the private use of the owner
Garden pools for the habitation of water plants and/or aquarium fish not exceeding 200 mm in depth and exclusively for private use
Installation of window grilles
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
6. The number of allowable storeys/floors above established grade for a residential 1 (R-1) type of building is?
3 storeys
4 storeys
5 storeys
6 storeys
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The following are the minimum requirements for Group A dwellings, except
Every dwelling shall be provided with at least one sanitary toilet and adequate washing and drainage facilities
Footings shall be of sufficient size and strength to support the load of the dwelling and shall be at least 250 millimeters thick and 600 millimeters below the surface of the ground
Every dwelling shall be so constructed and arranged as to provide adequate light and ventilation
There shall be at least two entrances and another one for exit
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum width of corridor or exit balcony serving as a required exit for an occupant load of more than ten (10)?
1.20 meters
1.10meters
1.00meters
1.25meters
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Juncture of the roof and vertical surfaces, must be provided with
Painting
Ridge roll
Downspout
Flashing
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who shall be the responsible for carrying out the provision of the Building Code as well as the enforcement of orders?
Building Officials
Authority
Office of the City Engineer
DOH
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Testing of Materials_1
Quiz
•
University
10 questions
3D Printing by JarWiz
Quiz
•
University
10 questions
General knoledge
Quiz
•
5th Grade - Professio...
15 questions
Design C Summative
Quiz
•
7th Grade - University
10 questions
basic of robotics
Quiz
•
6th Grade - Professio...
9 questions
Aladdin Quiz
Quiz
•
KG - Professional Dev...
10 questions
Five Nights at Candy's
Quiz
•
4th Grade - University
10 questions
Disney characters
Quiz
•
1st Grade - University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
Discover more resources for Design
7 questions
How James Brown Invented Funk
Interactive video
•
10th Grade - University
5 questions
Helping Build the Internet: Valerie Thomas | Great Minds
Interactive video
•
11th Grade - University
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
23 questions
Subject Verb Agreement
Quiz
•
9th Grade - University
7 questions
Renewable and Nonrenewable Resources
Interactive video
•
4th Grade - University
19 questions
Review2-TEACHER
Quiz
•
University
15 questions
Pre2_STUDENT
Quiz
•
University
20 questions
Ch. 7 Quadrilateral Quiz Review
Quiz
•
KG - University