1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What does "BMS" stands for?

Bridges Management System

Basic Management System

Bridge Manager System

Bridge Management System

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

It is the official procedure or system to monitor the condition of bridges on national roads and to develop programs for the major maintenance, upgrading, and replacement of bridges requiring intervention to provide the required level of service.

RSMS

RBIA

BMS

RTIA

Answer explanation

Media Image

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Based on DO 43 s.2008, "All data for the operation of the BMS shall be stored in the ________ (RBIA) in accordance with RBIA requirements."

Road and Bridge Inventory Application

Road and Bridge Information

Application

Roads and Bridges Inventory Application

Roads and Bridges Information

Application

Answer explanation

Media Image

All data for operation of the BMS shall be stored in the Road and Bridge Information Application (RBIA) in accordance with RBIA requirements.

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The pilot project on road slope in Region X is situated in what municipality?

Manolo Fortich

Kulaman

Sumilao

Lantapan

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

_________ is performed to restore small areas

where sound concrete is damaged by spalling,

scaling and impact. The patch thickness is limited

to a maximum of 100 mm depth of hollow surface.

Caulking

Patch Repair

Carbon Fiber Sheet Bonding

Epoxy Injection

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

It is recommended as preventive maintenance, made from

polymer cement with lithium nitrate, which is effective against chloride ions especially if the bridge is located less than 1 kilometer from coastal area.

Protective Coating

Steel Plate Bonding

Protective Mortar

Patching

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

It is applied to protect the deteriorated concrete due to corrosion of rebars, damage due to rapid water flow or broken due to continuous impact from materials flowing in the channel such as driftwoods.

Concrete Jackket

Concrete Mortar

Concrete Epoxy

Concrete Jacket

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?