
test 20/10
Authored by Đức Anh
English
University
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
35 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The wall has an area of approximately 20 square metres
a. The wall is approximately 20 square metre area.
b. The area of the wall has approximately 20 square metres.
c. The wall has approximately 20 square metres area.
d. The wall is approximately 20 square metres in area.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The heating contractor should finish no later than the end of week 40.
a. The heating contractor should finish soon after week 40.
b. The heating contractor should finish by early week 40.
c. The heating contractor should finish before week 40.
d. The heating contractor should finish by the end of week 40.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The contact faces of the joint are………….
a. flat machined
b. machining flat
c. flat machines
d. machined flat
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why has the ground been excavated before the concrete foundations are constructed?
a. Why has concrete foundation been constructed before the ground is excavated?
b. Why has concrete foundation been constructed after the ground is excavated?
c. Why are concrete foundation constructed after the ground has been excavated?
d. Why are concrete foundation constructed before the ground has been excavated?
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The cladding fixers begin immediately after the steel erectors have finished.
a. The cladding fixers begin nearly after the steel erectors have finished.
b. The cladding fixers begin nearly soon the steel erectors have finished.
c. The cladding fixers begin soon before the steel erectors have finished.
d. The cladding fixers begin as soon as the steel erectors have finished.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Coarse aggregate ranges in size from 5 mm to 40 mm.
a. Coarse aggregate ranges from 5 mm and 40 mm.
b. Coarse aggregate varies from 5 mm to 40 mm.
c. Coarse aggregate varies between 5 mm and 40 mm.
d. Coarse aggregate ranges between 5 mm and 40 mm.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The plumbers work simultaneously with the roofing contractor.
a. The roofing contractor works same time as the plumbers.
b. The roofing contractor works at the same time as the plumbers.
c. The roofing contractor works at the same time with the plumbers.
d. The roofing contractor works same time with the plumbers.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?