PROF PRAC - UAP CON 301

PROF PRAC - UAP CON 301

Professional Development

31 Qs

quiz-placeholder

Similar activities

Recap - Skin, Hair, Nails and Skeletal System

Recap - Skin, Hair, Nails and Skeletal System

Professional Development

27 Qs

AES - T41BDK

AES - T41BDK

KG - Professional Development

28 Qs

Introduction to Data-link Layer

Introduction to Data-link Layer

Professional Development

31 Qs

Supervisory

Supervisory

Professional Development

30 Qs

OMTQM Midterm Exam (30 POINTS)

OMTQM Midterm Exam (30 POINTS)

Professional Development

26 Qs

Crit/Norm-referenced & Occ/Comp. Based

Crit/Norm-referenced & Occ/Comp. Based

Professional Development

26 Qs

OnTime Brands - Quiz 2

OnTime Brands - Quiz 2

Professional Development

29 Qs

SGS - I AM SOLITAIRE

SGS - I AM SOLITAIRE

Professional Development

30 Qs

PROF PRAC - UAP CON 301

PROF PRAC - UAP CON 301

Assessment

Quiz

Arts, Professional Development

Professional Development

Hard

Created by

Frank Lloyd Wright

Used 157+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The committee assigned to formulate the UAP Documents.

UAP Committee on Professional Practice

UAP Committee on Professional Practice & Ethics

UAP Committee on Standards on Professional Practice

None of the Above

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The Contract consists of the following documents, including all additions, deletions and modification incorporated therein before the execution of the Contract, except?

Drawings

Special Provisions

Technical Specifications

None of the Above

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Theses are prepared to provide consistency and to instruct construction contractors on how the works are to be carried out, the quality of the workmanship and methods of quality assurance for the construction.

Drawings

General Conditions

Technical Specifications

Outline Specifications

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

It is a brief description of the main components to be used in construction. They should be described in sufficient detail to allow the cost consultant to prepare some approximate quantities.

Drawings

Special Provisions

Technical Specifications

Outline Specifications

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Are instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General Conditions of the contract.

Drawings

Special Provisions

Specifications

General Conditions

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

It is any "lesser" criminal act in some common law legal systems.

Criminal Crime

Misdemeanor

Violence

Misdimeanor

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

This word shall be understood to mean “furnish and install”

Build

Provide

Complete

Work

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?