G10 REVISION Ch 7 Systems Lifecycle: Implementation

G10 REVISION Ch 7 Systems Lifecycle: Implementation

9th - 10th Grade

21 Qs

quiz-placeholder

Similar activities

Java-Chapter 12 Exam

Java-Chapter 12 Exam

9th - 12th Grade

20 Qs

ALGORITMA

ALGORITMA

10th Grade

20 Qs

Functions in Python

Functions in Python

9th - 12th Grade

16 Qs

Input & Output Device

Input & Output Device

7th - 9th Grade

20 Qs

Java-Chapter 10 Exam

Java-Chapter 10 Exam

9th - 12th Grade

20 Qs

Python Basics Review

Python Basics Review

10th Grade

18 Qs

system development life cycle GCSE WJEC CBAC

system development life cycle GCSE WJEC CBAC

10th Grade

20 Qs

Hardware - Homework 2

Hardware - Homework 2

9th Grade

24 Qs

G10 REVISION Ch 7 Systems Lifecycle: Implementation

G10 REVISION Ch 7 Systems Lifecycle: Implementation

Assessment

Quiz

Computers

9th - 10th Grade

Hard

Created by

Fritz Bansag

Used 52+ times

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The new system is gradually introduced. When parts of the new system are working at a satisfactory level then more elements of the system are phased in.

Eventually the old system will be phased out over a period of time.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The existing system is stopped and replaced by the new system immediately

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The new system is trialed in a department of the organisation, and if the system is successful, then it will be implemented across all departments.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, the existing and the new system work together for a period of time until the new system fully takes over.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, it is time consuming as every part of the system which is implemented needs to be evaluated.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, tasks are not duplicated, costs are reduced as only one system is being used.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, if the new system does the meet the requirements then the old system is still available as both systems are working together.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?