1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The new system is gradually introduced. When parts of the new system are working at a satisfactory level then more elements of the system are phased in.

Eventually the old system will be phased out over a period of time.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The existing system is stopped and replaced by the new system immediately

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The new system is trialed in a department of the organisation, and if the system is successful, then it will be implemented across all departments.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, the existing and the new system work together for a period of time until the new system fully takes over.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, it is time consuming as every part of the system which is implemented needs to be evaluated.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, tasks are not duplicated, costs are reduced as only one system is being used.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method of changeover, if the new system does the meet the requirements then the old system is still available as both systems are working together.

Direct Changeover

Phased Implementation

Pilot Running

Parallel Running

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?