ID1 4.02 Review

ID1 4.02 Review

9th - 12th Grade

14 Qs

quiz-placeholder

Similar activities

Construction Drawings Part 2

Construction Drawings Part 2

11th Grade

10 Qs

Intro to Costuming

Intro to Costuming

9th - 12th Grade

11 Qs

CPAR

CPAR

12th Grade

15 Qs

Tata Artistik Televisi Quiz

Tata Artistik Televisi Quiz

11th Grade

15 Qs

You are the Costume Designer

You are the Costume Designer

6th - 12th Grade

9 Qs

Horticulture II, Landscape

Horticulture II, Landscape

12th Grade

18 Qs

Career Paths

Career Paths

9th - 12th Grade

15 Qs

ID1 4.01 Review

ID1 4.01 Review

9th - 12th Grade

10 Qs

ID1 4.02 Review

ID1 4.02 Review

Assessment

Quiz

Other

9th - 12th Grade

Medium

Created by

Heidi Breeden

Used 56+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tricia liked the interior designer's portfolio and decided to hire him for her project. This happens during:

Schematic Design

Design Development

Pre-Design

Contract Documents

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mark created quick sketches from the information the client has given him, to help envision the project. What part of the design process is he in?

Schematic Design

Design Development

Programming

Contract Documents

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which of these steps of the design process is the designer ready to have their client review designs?

Schematic Design

Design Development

Programming

Contract Documents

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When working with clients on their project, it is okay for the designer to make changes in the design and never ask for client approval.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The kitchen and bath designer had to coordinate the cabinetmaker, cabinet installer, counter top installer, and the tile installer to make sure the job was completed correctly during the _______ phase of the design process.

Programming

Move-in / Post-Occupancy

Schematic Design

Contract Administration

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The designer finalized the design for the house and submitted the paperwork for the clients to sign. What is this paperwork known as?

Ideation

Innovation

Proposal

Prototype

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A designer is monitoring work to be completed by an electrician, a plumber, and a cabinet installer for the Shulers' kitchen. Which stage of the design process would this be considered?

Contract Administration

Programming

Design Development

Schematic Design

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?