Search Header Logo

Power System Operator

Authored by vamshi ballikonda

Physics, Science

Professional Development

Used 1+ times

Power System Operator
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

38 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Energy consumption per unit of GDP is called as:

Energy Ratio
Energy Intensity
Per Capita Consumption
None

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Star rating is a part of ______ programme of BEE

DSM
BLY
S&L
None

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As per IEGC (latest amendment) “frequency band” in Hz is

49.90 – 50.05
49.5 – 50.3
49.7 – 50.2
49.5 – 50.2

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Action for non-compliance of IEGC may be taken by

Central Electricity Authority (CEA) on recommendation by RPC or RLDC
Regional Power Committee (RPC) on report by RLDC
Central Electricity Regulatory Commission(CERC) on report by RPC and RLDC only
Central Electricity Regulatory Commission(CERC) on report by any person or suo-motu

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A part of the grid can be deliberately isolated from the rest of the National/Regional grid, only

under an emergency, or to prevent collapse of grid
for safety of human life
when serious damage to a costly equipment is imminent and such isolation would prevent it,
All of these

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As per IEGC, restricted governor mode of operation is to be implemented for generating stations synchronized with grid ( with exceptions mentioned in IEGC) of the following category.

All thermal generating units of 200 MW and above
All hydro units (except those with upto three hours pondage) of 10 MW and above,
Thermal units >=200MW and Hydro units >=10MW owned by central sector Generating companys
All coal/lignite based thermal generating units of 200MWand above, open cycle gas turbine/CCGT of capacity more than 50MW and all hydro units of 25MW and above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As per stipulations in IEGC, the control Area jurisdiction of any generating station

Can not change once decided
May be in one control area (i.e. SLDC) at one point of time and another control area (i.e. RLDC) at another point of time
As decided by RPC
As decided by RLDC

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?