A LEED Project is pursuing the following credits: SS Credit Places of Respite, SS Credit Direct Exterior Access, MR Credit PBT Source Reduction – Mercury and MR Credit Design for Flexibility. Which of the following project adaptations under BD+C does this project fall?
LEED Process & Project Surroundings | BD+C

Quiz
•
Architecture
•
Professional Development
•
Hard
Tony Vannoy
Used 1+ times
FREE Resource
57 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Core and Shell
New Construction
Healthcare
Hospitality
Schools
Answer explanation
Refer credit summary charts and memorize the special credits that only apply to certain rating system adaptations such as Core and Shell and Schools & Healthcare.
The credit mentioned in question are all ONLY applicable to healthcare projects
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
What options within LEED Credits address different geographic and climactic regions while providing solutions to challenges faced by projects at a regional level?
Innovation credits
Alternative Compliance Paths (ACPs)
Integrative Process
Minimum program requirements (MPRs)
CIRs
Answer explanation
ACP’s address different geographic and climactic regions while providing solutions to challenges faced by projects at a regional level.
Global Alternative Compliance Paths are available to international projects to assist them in meeting LEED Requirements
3.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
How many RP Credits are identified for every location?
6
5
3
4
Answer explanation
USGBC established a process that identified six RP credits for every location and every rating system within chapter or country boundaries.
4.
MULTIPLE SELECT QUESTION
1 min • 1 pt
Which of the following may earn a project IN Credit Innovation under Option 1 – Innovation? (Choose 2)
Designing and implementing a green education program
A closed pilot credit
Designing and implementing a green housekeeping program
Corporate a carpool program
Achieving LEED Certification under two different rating systems
5.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
What best defines the LEED Project Boundary?
Portion of the project site submitted for LEED Certification
Total area within the platted property line not including any non-constructed areas
Total area within the platted property line not including any constructed areas
Platted property line of the project defining land and water within it
Total area within the platted property line including any constructed areas and non-constructed areas
Answer explanation
Please refer the additional guidance under LEED Property Boundary in the study guide.
The project boundary is the platted property line of the project defining land and water within it.
6.
MULTIPLE SELECT QUESTION
1 min • 1 pt
Which of the following project strategies would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies? (Choose 2)
Achieve a HVAC background noise level of 35 dBA or less
Doubling the highest transit service point threshold for alternative transportation
Achieve SS Credit Heat Island Reduction Option 1 Non-Roof and Roof and SS Credit Heat Island Reduction and Option 2 Parking Under Cover and place 75% of parking under cover
Achieve a 55% energy savings
Use 100% non-potable water for cooling tower
Answer explanation
It might be difficult for you to answer this question correct since we didn’t discuss many of these options. Once you are done with all the sustainability categories (LT, SS, WE, EA, etc.), you will be equipped to answer questions related to exemplary performance credits
Refer to the credit summary tables to see all the credits that provide an opportunity to earn exemplary performance points.
EA Credit Optimize Energy Performance offer exemplary performance for 54% or more energy savings.
LT Credit Access to Quality Transit offer exemplary performance credit for doubling the
7.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The project team for a potential LEED Project in Phoenix, Arizona submits a summary of early design stage submittal materials for GBCI review to pursue LEED Pre-Certification. Which of the following statements must be true of the project?
The project must be registered under Core and Shell
The project must be registered under New Construction
The project can only apply for Pre-Certification after the completion of detailed design documents
The project can only apply for Pre-Certification after the completion construction
Answer explanation
LEED Pre-Certification is a unique aspect of LEED for Core and Shell Program that projects may pursue this option, but are not required.
Pre-Certification is formal recognition by GBCI given to a candidate project for which the owner/developer has established the goal of developing a LEED Certified building.
Create a free account and access millions of resources
Similar Resources on Quizizz
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade